Skip to main content
✉ Email plans to kb@takeoffservicesllc.net for a quick quote, or upload through the form belowReplies within 30 minutesEstimating desks covering all 50 states
TS
Takeoff Services LLC
Where Bidders Win
INSURANCE RESTORATION DESK

Xactimate® insurance estimates, Xactimate estimating services for restoration contractors

Mitigation invoices, rebuild estimates and supplements written in Xactimate, on the price list you name, with the list version and its effective date printed on the file. Delivered as an ESX and a PDF in 24-96 hours from an approved fixed quote, after a second estimator has read it.

24-96h from an approved quote Carrier ready ESX and PDF Price list named on the file
PDF or ZIP up to 25 MB through the form, or a Drive, Dropbox or OneDrive link when a fire loss runs 600 photos. NDA signed on request.

What lands in your inbox

  • The ESX, plus a PDF estimate report with the summary page
  • Sketch pages whose room names match the line items exactly
  • A photo report tying images to the scope they support
  • F9 notes on every judgment call, naming what documents it
  • A written assumptions, inclusions and exclusions sheet
Editable Excel or CSV rides along for job costing. You approve a fixed price in writing before anyone opens Xactimate.
24-96h
Delivery from approved quote
2
Estimators read every file
50
States, delivered remotely
7,500+
Projects estimated firm wide
1,600+
Contractors served
WHO SENDS US FILES

Xactimate estimating services for restoration contractors, and the general contractors who rebuild for them

Four kinds of buyer send claim files to this desk, and each needs a different document out the other end. Which one you need is decided by where you sit on the claim, not by how bad the loss was.

MITIGATION AND REBUILD

Restoration contractors

Equipment runs Monday and you are rebuilding a month later, which is two documents on one claim number. The mitigation invoice comes off the drying log. The rebuild estimate comes off the sketch. Written by the same desk, they reconcile instead of arguing.

Mitigation bills on completion, the rebuild starts on ACV
Sent back for: equipment days past the last documented reading
One claim, two files, one set of room names
REBUILD ONLY

Outsourced Xactimate estimate writing for general contractors

You picked up the rebuild after somebody else dried the structure, so the estimate in the file is their scope, their room names, their assumptions. We write yours against what the photos and the demolition show, and state in writing where the two documents disagree.

Feeds your subcontractor buyout, not only the settlement
Sent back for: scope reaching past the stated cause of loss
The prior estimate is read and cited, never quietly copied
REPRESENTING THE INSURED

Xactimate estimates for public adjusters

You need the scope written in the carrier's own tool and its own line items, so the conversation is about coverage rather than format. We build the file and hand it to you. You represent the insured, because that is your license and your job, not ours.

Feeds your position, in the format the desk already reads
Sent back for: no photo support on the judgment items
We produce the document, you own every conversation about it
EXTERIOR AND ROOFING

Roofing and exterior contractors

A roof file lives on squares, pitch, facets and layer count. Pitch is what earns a steep charge, eave height is what earns a high charge, and layer count is what you are actually paid to tear off. Send an EagleView report or your field measurements and the roof is written off measured geometry rather than a guess at the slope.

Feeds the supplement when tear off exposes a second layer
Sent back for: steep charges with no pitch to support them
Ice and water barrier, drip edge, starter and ridge counted separately
Send one claim and judge the desk on the document rather than on this page. The fixed price comes back before anything is written.Send one claim file
BY LOSS TYPE

Insurance restoration estimating services, by loss type

Open the loss you are holding. Each group names what the scope is actually assembled from, because a water file and a smoke file are built out of different evidence even when the room is the same.

Water losses

Category and class decide the scope before a line is written.

Category 1, a clean supply line

CAT 1

Scope comes off the affected material inventory and the daily readings. Class drives the equipment count, the sketch drives the reinstall, and both halves must agree on which rooms were wet.

Category 2 and 3, grey and gross contamination

CAT 2 AND 3

Removal runs wider than the wet line, so antimicrobial application and containment become defensible items. These files are argued on the distance between what was wet and what was removed, which is why the source of the water and how long it sat, the two things that actually set the category, go into the file.

Fire and smoke damage estimate Xactimate

Two different scopes wearing one word.

Structure fire with heat damage

HEAT

Demolition to sound material, then a rebuild reading like new construction inside an existing shell. Debris is written from measured volume and trip count, because on a full structure fire it is the largest item nobody photographs.

Smoke and odor without heat

SMOKE

Cleaning, HEPA vacuuming, duct cleaning, and a sealer coat plus a stated finish coat count. A room enters the scope because a photo or a reading puts it there. Adding the rest of the floor because it is adjacent is the pattern automated review exists to catch.

Contents pack out estimate Xactimate

The file most contractors leave defensibility in.

Inventory and the non restorable list

INVENTORY

Room by room inventory with condition noted, plus a separate non restorable list carrying the reason each item is on it. The two must be mutually exclusive or the file reads as double counted.

Pack out, storage and packback

HANDLING

Handling, transport, storage by the month and packback are four cost events, and storage months run against rebuild duration. Content manipulation, moving contents inside a room to work behind them, is its own line and is constantly confused with pack out.

Large loss commercial insurance restoration estimate

Where the file stops being a document and becomes a set.

Multi story and multi building losses

LARGE LOSS

Grouped by building, level and unit, common areas separated from tenant space, room naming that survives a reader who was never on site. On a large loss, navigability is a scope defense in itself.

Apartment and condominium buildings

MULTI FAMILY

A multi family insurance restoration estimate carries repeating unit types, so scope is written once per type and applied by unit, with the units that differ called out. Association and unit owner policies cut the building in different places, so we write by physical area and label it.

Work that is not a claim file

Three jobs that arrive here and belong on another desk.

A rebuild the owner is paying for

NOT A CLAIM

No claim, no carrier, no price list. That work prices from labor, material, equipment and your own markup, which is a different desk and a different document.

See construction estimating services

A house rebuilt outside a claim

HOUSING

A custom home, an addition or a full gut funded by a lender or an owner rather than a policy. Same building, different pricing basis.

Residential construction estimating services

A commercial building outside a claim

TENANT WORK

Tenant improvement, a shell fit out, a negotiated rebuild with no carrier in it. It prices from the market the work gets built in, not from a list published for a loss zip.

Commercial construction estimating services
Loss type not listed, or a claim that is two of these at once? Describe it in three lines and an estimator will tell you what the file needs.Describe the loss
PRICE LIST POLICY

Which Xactimate price list your file is written on, stated in writing

Verisk publishes price lists monthly and they are region and zip specific. Pick the wrong one and the file bounces before anybody reads a word of your scope. So the rule this desk follows is published in advance rather than discovered afterwards.

Which Xactimate price list to use for a date of loss

Date of loss, date of repair, or a list that moved out from under a long job.

Date of loss is the default

DEFAULT

Unless you say otherwise, the file is written on the list published for the month the loss happened, in the region the loss zip falls in. The list carries regional pricing and the local sales tax rate, so a neighboring region can be a real percentage away on the same line item.

Date of repair, and when it is the right call

BY AGREEMENT

Some carriers and programs settle on the list current when the work is performed. Name it at intake and the file is written that way. We do not choose between the two on your behalf, because that choice touches settlement position, and settlement position is yours.

A loss that is fourteen months old

AGED FILES

The list from the month of loss still exists and can still be written on. Moving an existing ESX onto a current list is a reprice rather than a rewrite, so it is quoted lower because the scope already exists. Send the ESX instead of a PDF and it is cheaper again.

A rebuild that outruns the list it started on

LONG JOBS

A nine month rebuild written on a list from month one is priced in money that no longer buys the material. That is a legitimate reason a supplement exists, and the one contractors raise last and lose most often.

You name the list, or we name the one we used

There is no version of this where the price list is a mystery.

The list you name

YOUR CALL

If a carrier, program or TPA mandates a list, tell us and we write on it. We do not substitute a different list because we think it prices better. Send the program rules with the claim and the estimate is written inside them rather than corrected into them later.

Our default when you name nothing

FALLBACK

The list published for the month of loss, in the region the loss zip falls in. The list we intend to use appears in the fixed quote by version and effective date, so if it is wrong for your claim that is a two word reply and it costs nothing, because nothing has been written.

What the delivered file states

ON THE FILE

The version, effective date and region are printed on the estimate and repeated on the assumptions sheet. A mismatch is caught by automated review before a human reads the scope, so the whole file comes back over a header. Naming the list is the cheapest defensive move on an insurance estimate.

Not sure which list your carrier expects? Say so at intake and it is confirmed in the quote before a line is written.Confirm my price list
TRY ONE FILE

Send one claim and read the file before you send a second

One loss, one fixed price agreed in writing first. Judge the price list header, the F9 notes and the summary page, then decide whether another file follows.

Get a fixed quote See how it starts
SKETCH

Sketch discipline, room by room

A sketch error is never one wrong number. Wall, ceiling and floor quantities derive from the geometry, so a room drawn a foot short quietly moves every surface driven item inside it. This is the order the sketch gets built in.

1

Start from measured geometry, not from memory

Field measurements, a Matterport TruePlan .SKX, a DocuSketch export, an Encircle or magicplan file, or an EagleView report for a roof. Any of them beats a hand sketch with three dimensions on it. When the source is a scan, the imported geometry gets checked against a dimension you measured by hand, because a scan that drifted still looks perfect.
Before anything is drawn
2

Room names before geometry

Rooms are named once, and that name carries onto the sketch, the line items, the photo report and the assumptions sheet. Bedroom 2 stays Bedroom 2. A photo report labeled to one set of rooms and an estimate labeled to another forces a reviewer to map your file before reading it, and that costs more goodwill than any single line item.
Step 2
3

Dimensions, then the surfaces they drive

Length, width and ceiling height produce the wall SF, ceiling SF, floor SF and perimeter LF most of the estimate runs on. Openings come out of wall SF and matter on paint and drywall. Missing walls go where the wall genuinely is not. Draw a 9 foot ceiling at the 8 foot default and every wall driven item in that room is eleven percent short, silently, and it still totals.
Step 3
4

Offsets, stairs, sloped ceilings and roof facets

Furrdowns, soffits and bulkheads are drawn rather than averaged away, because averaging is how a kitchen ends up with more paintable wall than it physically has. Stairs, landings, vaulted and tray ceilings each have a correct way to be drawn. On the exterior, pitch and facet count drive squares, waste and the steep and high question.
Step 4
5

A Xactimate estimate with sketch and room dimensions that agree

The last pass ties the two halves together. Every quantity traces back to the geometry that produced it, and anything that will not reconcile is fixed before the file leaves. A room in the estimate that is not on the sketch, or a sketch room carrying no scope, comes back to you as a question rather than shipping as a line nobody notices.
Send the scan or the measurements
Before release
Only have photos and a rough hand sketch? Send them anyway. You will be told what is missing before you approve a price.Send what you have
ANATOMY OF A LINE

Line item anatomy, code, selector, activity, unit

A Xactimate estimate writing service is judged on four small decisions repeated a few hundred times. Get one of them near right instead of right and the file still totals, still prints, and still reads wrong to the person reviewing it.

The four parts of every line

The code decides the price. Everything after it is arithmetic on that decision.

Category and selector

WTR, DMO, DRY

The three letter category and the selector under it are the pricing decision. WTR, HMR, DMO, DRY, PNT, FCC and CLN each carry their own logic about what the line already includes.

  • The near miss code is the silent error

    Two selectors describing almost the same work carry different inclusions and different unit prices. Pick the neighboring one and nothing looks wrong: right room, right quantity, plausible total. It is the most common defect in outsourced estimate writing and it is invisible without a second reader.

The activity on top of the code

R&R, D&R

Remove, replace, R&R and detach and reset are four cost events on one material. A toilet pulled to replace flooring is detached and reset. A toilet destroyed by the loss is removed and replaced. The photo record decides which, and the note says which photo decided it.

The unit of measure

SF, LF, SY, EA, DA, HR

The unit is where sketch geometry meets the price. Carpet quoted in SY against a floor drawn in SF is a ninefold error waiting to be noticed. DA gets audited hardest, because one extra day across eight air movers with no reading behind it is the first pattern a reviewer looks for.

Modifiers, and the market conditions question

MODIFIERS

After hours, weekend and emergency modifiers go in where the timeline supports them, not as a habit. A line whose note names the callout time and the reason is defensible. The same line with no note reads as padding and drags the rest of the file with it. A market conditions adjustment is a different animal: it is a documented request against a named event, not a modifier you tick.

Where line item files quietly go wrong

Three defects that survive a total check and fail a review.

Overlapping scope on one surface

OVERLAP

A remove line and an R&R line on the same wall. A seal line inside a paint selector that already includes it. The second read groups items by room and surface rather than reading down the list, because overlap is invisible in a sorted report and obvious in a room.

Labor minimums stacked in one room

MINIMUMS

Minimums exist because a trade cannot mobilize for four square feet. Three minimums for one trade on one visit is not three mobilizations, and a reviewer knows it. Where a minimum is earned the note says what the trade came out for. Where it is not, it comes out.

Orphan lines and buried waste

ORPHANS

A line in a room with no documented damage contributes small money and large doubt. Waste added silently into a measured quantity makes the sketch and the estimate disagree, and the sketch is what a reviewer can check. The final pass walks the estimate room by room against the photo report.

The scope is your margin, which is why every judgment inside it is written down beside the line rather than absorbed into a total you cannot audit. Already holding a file you are unsure about? Send the ESX and ask for a read before it goes anywhere else.Have a file read
THE JUSTIFICATION LAYER

The justification layer, written into the line

A file gets approved on the first pass when the reviewer never has to ask why an item is there. The note attached to the line is where that question gets answered before anybody thinks to ask it.

What goes into a Xactimate estimate with F9 line item notes?

Four things: what the item is for, what documents it, the requirement that makes it necessary, and the photo or reading it ties to. Two sentences is usually enough. A note repeating the line item description adds nothing, and a note arguing coverage belongs to a conversation this desk takes no part in.

How do code upgrade line items and ordinance and law get cited?

By citing it. The IRC or IBC section number plus the local amendment if your jurisdiction has one, written beside the line it justifies. The note separates what code requires from what is simply better practice, because ordinance and law is separate, capped coverage that will not fund everything a code demands.

How many photos does a line item actually need?

Enough to walk somebody through a room they were never in: a property overview, a room overview from two opposite corners, the damage itself, and a close up with a scale reference. Judgment items need the close up. Obvious items do not, and padding a photo report dilutes the ones that matter.

Which line items always get a note, and which do not?

Anything a reviewer could challenge: minimums, modifiers, equipment days, code driven items, anything unusual for the loss type, and any quantity not obvious from the sketch. Standard replacement of a documented damaged material needs no note, and giving it one buries the notes doing real work.

Every judgment call arrives with its reason attached, so the first question back to you is about coverage rather than about our arithmetic.See it on my claim
TWO DISCIPLINES

Mitigation and rebuild are two different disciplines

They arrive on one claim number and they are built from completely different evidence. One is billed from a drying log. The other is billed from a sketch. Writers who treat them as a single document give the mitigation invoice away.

Running both on one claim? Say so at intake and the two files are written against one set of room names, which removes the argument before it starts.Order both files
QUESTION FIRST?

Ask an estimator before you send anything at all

Which price list, whether your carrier takes an ESX, what a thin photo record can support. Ask first, or open the redacted file set and read a real one instead.

Ask an estimator Call (510) 810-0346
AFTER THE FIRST ESTIMATE

Supplement, reprice or revision, three different jobs

Insurance supplement writing is not one service. What you need depends on whether the scope changed, the price list changed, or we got something wrong, and those three cost different amounts because they are different amounts of work.

One well documented supplement lands better than five small ones. Hold them until demolition is complete unless the money is stopping the job.
Demolition exposed damage nobody could seeSupplementDemo photos, moisture map, approved estimateFixed quote on the added scope only
The desk adjuster's scope missed a roomSupplement after adjuster scopeTheir ESX, your scope sheet, room photosQuoted off the delta, not the whole file
Code requires work the estimate does not carrySupplementThe code section and any local amendmentQuoted on the added scope, code cited on the line
A roof reopened for missing componentsRoof supplement Xactimate estimatePitch, facets, layer count, tear off photosQuoted on what was exposed, not the whole roof
The job ran long and the price list movedRepriceThe original ESX and the job datesCheaper than writing the file again
We put something in the file wrongRevisionPoint at the lineNo charge, on unchanged scope
You want a room renamed or a format changeRevisionTell us what to changeIncluded, on unchanged scope
Swipe to compare all four columns.
Send the approved estimate and the new evidence together. Which of the three jobs it is comes back with the price, before anything is written.Price a supplement
MONEY MECHANICS

Overhead, profit and depreciation, answered honestly

These three lines decide what reaches your account and when. Most of this category either avoids them or promises outcomes nobody controls. Here is what is convention, what is arithmetic, and what is decided somewhere neither of us sits.

Overhead and profit documentation on insurance estimates

A convention, not a statute, and worth understanding as one.

The three trade convention

10 AND 10

The informal rule that general contractor overhead and profit, commonly 10% and 10%, is appropriate where a job requires three or more trades coordinated. It grew up in practice. It is not law, it is not in most policies, and no vendor can make it apply.

  • What documentation actually does here

    A file showing the trades involved, the sequencing between them and the coordination the job required makes the position visible and checkable. That strengthens it. It does not decide it, and anybody telling you they can decide it is selling something this desk does not sell.

Why Xactimate keeps it off the line

STRUCTURE

Line items are built without general contractor overhead and profit inside them, which is why O&P is applied separately rather than hidden in unit costs. Trade markup sits inside what a subcontractor charges you. General conditions are a third thing again, and confusing the three gets a paragraph written back at your file.

Self performed work

CONTESTED

Carriers frequently strip general contractor O&P where the contractor self performs most of the work, arguing there was little coordination to pay for. We write what the file supports and document the coordination that happened. We do not call your adjuster about it and we do not promise the line survives.

RCV, ACV and what the first check funds

The arithmetic that decides your cashflow for three months.

RCV is the cost, not the check

RCV

Replacement cost value is what it costs to replace the property today at the price list on the file. It is the number everyone quotes at each other and it is not what arrives first. The estimate produces the cost; the policy decides what portion is payable and when.

Depreciation, and the two kinds of it

ACV

Taken against age over expected life and adjusted for condition, then subtracted from RCV to give actual cash value. Recoverable depreciation releases once work is completed and documented; non recoverable never comes back. Whether labor can be depreciated varies by policy language and jurisdiction and has been litigated both ways, so we name the treatment and leave the argument where it belongs.

Recoverable depreciation release final invoice

The last document on the claim, and the one assembled worst.

A final invoice that reconciles line for line

RELEASE

The release package usually needs a final invoice tying to the approved estimate line for line, a certificate of completion and completion photos. Where the work performed differs, the supplement that authorized it is referenced. Silent differences between estimate and invoice are the most avoidable reason a release stalls.

The summary page arithmetic

SUMMARY

RCV, depreciation, ACV, deductible, prior payments and net claim sit on one page a desk adjuster reads before anything else. Two errors show up constantly: a deductible applied twice, and a prior payment left off. A slip there destroys the credibility of two hundred correct lines behind it, so both estimators check it.

Send the settlement documents with the claim and the summary page is built against your real deductible and prior payments rather than a blank.Ask about a summary page
WHY FILES BOUNCE

Why estimates get kicked back, and what happens next

The first reviewer of your file is software. ESX files move through XactAnalysis, where automated rules run scope overlap and item inclusion checks and flag duplicates, pricing anomalies and missing information before a human opens anything. Internal consistency beats a bigger total.

Wrong price list, or the right list for the wrong month
A regional list that does not match the zip the loss happened in
Quantities that do not reconcile to the sketch the file ships with
Duplicate or overlapping items sitting on the same surface
Minimum charges with no trip, no trade and no reason behind them
Overhead and profit applied where the file documents no coordination
Items reaching past the stated cause of loss into damage nobody claimed
Mitigation billed past the last documented drying reading
No photo support on the judgment items, however good the rest of the record is
Room names on the photo report that do not match the estimate
A summary page where the deductible or a prior payment is applied wrong
A final invoice that does not reconcile to the estimate it was approved from
If a file comes back and the cause traces to our work, it is corrected and rerun at no charge. If the carrier wants scope you never authorized, that is a new fixed quote in writing, never a line on an invoice afterwards.Send a returned file
WHAT YOU RECEIVE

What actually lands in your inbox, carrier ready ESX, PDF and the assumptions sheet

A carrier ready ESX file is the point of the exercise, but it is not the whole package and not the part you will read most. Here is every file, what it is for, and who can open it.

The file set

The same set on a single room water loss and on a multi building fire.

The ESX

THE NATIVE FILE

The working Xactimate file, which is what a carrier or TPA wants, because it opens and compares against their own scope rather than being retyped.

  • What it takes to open one, and whose file it is

    An ESX needs an active Xactimate license to open or edit, so if you hold no seat the PDF is your readable version and the ESX is what you forward. The estimate carries your company as preparer and is released on delivery with no watermark, no lock and no expiry. There is no portal here, deliberately.

The PDF estimate report

READ ANYWHERE

What your project manager, your insured and your office read without a license: line item detail with unit costs, grouped by room. The summary page carries RCV, depreciation, ACV, deductible, prior payments and net claim.

Sketch pages and the photo report

THE EVIDENCE

The sketch with dimensions and room names, and photos sitting against the scope they support rather than in the order the camera took them. Property overview first, then room by room in the estimate's own sequence.

The assumptions, inclusions and exclusions sheet

THE SCOPE RECORD

One page: price list version and effective date, what was assumed where evidence was thin, every question still open. We were not standing in the house, so unknowns are written down with what would resolve them rather than filled in with a plausible number.

Editable Excel or CSV

FOR JOB COSTING

The line items as an unlocked spreadsheet, so your office can push scope into job costing or build a subcontractor scope sheet from it. Send your cost coding layout and the export comes back in it.

How the file moves, and what it lands inside

Where your estimate goes after you send it, and the rules waiting there.

XactAnalysis and the automated first read

REVIEW

A file internally consistent between code, quantity, sketch and note passes cleanly to a human. A bigger total with loose internals gets flagged, and now a person opens it with a list of exceptions already in front of them.

TPA and direct repair program files

PROGRAM WORK

Program work carries mandated price lists, scope caps, cycle time targets, photo minimums and accuracy scoring, and a file that trips a rule costs you standing on the whole program rather than one job. Send the program rules at intake and the estimate is written inside them.

Carriers that do not use Xactimate

SYMBILITY

Some carriers run Symbility, now under Cotality following the CoreLogic rebrand in March 2025. Xactimate is the tool this desk writes in and we will not pretend otherwise. Name the platform at intake and you are told during the quote, not after delivery.

See a redacted file set first

FREE

A full file set with the claim details stripped out: the PDF and its summary page, a sketch page, line item detail with F9 notes visible, the photo report, the assumptions sheet and the spreadsheet export.

Open a redacted file set
Judge the file rather than the description of it. Open a redacted set, then send one claim and compare.Get my fixed quote
CLAIMS EVERY WEEK?

Put a storm month through a monthly partnership

The monthly queue runs your files first, with supplements ahead of new work and revisions included on unchanged scope. Tell us the claim volume you carry in a heavy month and it gets sized against that.

Size my model Talk it through
WHERE WE STOP

We write the estimate, you own the claim conversation

This is the section most of the category does not publish, and it is the one worth reading twice. What we will not do, who should not order this at all, and where doing it in house is simply cheaper.

We do not contact your adjuster. We do not negotiate, escalate or appear on a call with a carrier. In most states, negotiating a claim on behalf of an insured for a fee is public adjusting and requires a license, and where a contractor lets a vendor drift into that role the exposure lands on the contractor rather than the vendor. Half this category sells that service. We deliberately do not, and that is why we can be in your file at all.

There are files you should not send here. A single room Category 1 water loss your own estimator can write in forty minutes, in a week where their desk is not full, costs more to brief out than to write. If the carrier wants it tomorrow morning, 24 to 96 hours from approval does not make that, and this desk will not cut the second read to pretend it does. If you want somebody to argue the claim is worth more, that is a different profession with a different license.

There are things this service will not do inside a file we do write. We will not put a line in an estimate the documentation does not support, however certain you are it belongs. We will not apply overhead and profit where the file shows no coordination to justify it, because one stripped line takes the credibility of the whole estimate with it. We will not carry pre existing deterioration into a loss, and we promise no approval rates and no supplement outcomes.

When your own seat is genuinely cheaper
If your in house writer has capacity this week and the file is a single room with a clean cause of loss, keep it. If the scope is already settled and you only want the arithmetic checked, ask for the check rather than the rewrite, because it is a smaller job and it is quoted as one. Send the multi room fire, the large loss, the aged file that needs a reprice, and the week when four losses land at once. That is where an outside desk earns its fee and where a full time seat cannot flex.
No contact with your adjuster, your carrier or your TPA, on any file, ever
No negotiation, no escalation, no claim advocacy, offered or implied
We are not public adjusters and we do not act as one
No approval rates, no payout percentages, no supplement outcome claims
Your claim files, interior photos and insured names are never published or used as a sample
NDA signed on request before you send a single photo
No portal, no account, no software to install, no login that owns your file
Takeoff Services LLC is an independent estimating firm and is not affiliated with, endorsed by or sponsored by Verisk Analytics, Xactware or Cotality
If that boundary is the wrong shape for what you need, say so now rather than after you have paid for a file.Ask before you send
BEFORE WE WRITE A LINE

What to send us, before we write a line

Nobody sends all of this and the file still gets written. But every missing item is either a question back to you or an assumption written onto the sheet, and both cost you time you would rather spend on the job.

Claim number, carrier, and the adjuster's name if one is assigned
Date of loss, cause of loss, and the deductible on the policy
The loss zip, which sets the price list region and the sales tax on it
Policy type, and the mandated price list if a program controls this claim
The adjuster's estimate if one exists, as an ESX rather than a PDF where you can
Your scope sheet or field notes, however rough they are
Room by room photos: overview from two corners, the damage, then a close up with a scale reference
The moisture map and the daily readings if the structure was dried
Equipment placement, run days and the monitoring visit dates
Containment layout and any negative air or air scrubber placement
A Matterport TruePlan .SKX, a DocuSketch export, an Encircle or magicplan file, or an EagleView report for a roof
Anything the carrier has already written back to you, annotations included
Missing half of it? Send what exists. The gaps come back as questions in the quote, before you have spent anything, rather than as guesses inside a file you already paid for.Send the claim file
HOW WE CHARGE

Outsourced Xactimate estimator, per file, monthly or dedicated

The fee does not move with the size of the estimate. It is quoted from the work the file takes, approved in writing first, and it is the same fee whether the estimate lands at eleven thousand dollars or a hundred and ten thousand.

Three ways to buy restoration estimating outsourcing. Two estimators read every file in all three columns.
Best forA first file, or claims that arrive occasionallyA shop with claims running every weekVolume that justifies a person, not a hire
CommitmentNone, one claim at a timeFlat monthly retainerA monthly seat rather than a hire
Delivery24-96h from your written approval24-96h on a priority queue24-96h, your queue always first
RevisionsIncluded on unchanged scopeIncluded, supplements queued firstIncluded on unchanged scope
Who checks itTwo estimators, alwaysTwo estimators, alwaysYour writer, plus an independent audit
What moves the feeRoom count and evidence qualityVolume, agreed monthlyThe seat, not the file count
Typical saving~25-35% against writing it in house~40-55% against writing them in house~35-45% against a loaded in house seat
Swipe to see all three models.
Contractors looking for Xactimate estimators for hire usually start with one file and move to the monthly queue in their first storm month. Tell us the claim volume you carry and you will be told which column costs you less.Size my model
FAQ

Before you send the claim file

The questions restoration contractors and adjusters ask right before they upload a loss.

Cost and timing

How much does a Xactimate estimate cost?

It is quoted per file as one fixed price, after an estimator reads what you sent. No hourly meter, no percentage of the claim. You approve that price in writing before work starts, and it does not change unless your scope does.

How long does it take to get a Xactimate estimate written?

Between 24 and 96 hours, counted from the moment you approve the fixed quote. A single room water loss with a clean photo record sits at the fast end, a multi story fire rebuild with a full sketch and contents at the slow end. The date is named in the quote before you approve it.

Do you charge a percentage of the claim or the settlement?

No. The fee is fixed per file and does not move with the size of the estimate or with what the carrier pays. Contingency pricing gives an estimate writer a financial interest in the number, which is exactly what a reviewer is trained to look for.

The file itself

What is an ESX file?

An ESX is the native Xactimate estimate file. It holds the line items, the sketch, the photos and the price list the estimate was written on in one package. Carriers want it because it opens and reviews rather than being retyped out of a PDF.

Do I need a Xactimate license to open the ESX file?

To open or edit the ESX itself, yes, an active Xactimate license is required. That is why a full PDF estimate report ships alongside it, which anybody can read. If you hold no seat, you forward the ESX and work from the PDF and the spreadsheet.

Can the estimate be branded with my company name?

Yes. The estimate carries your company as preparer, and the file is released to you on delivery with no watermark, no lock and no expiry. There is no portal to log into and no subscription holding it. Once sent, it is your document.

Can you write in Symbility or Cotality instead of Xactimate?

No. Xactimate is the tool this desk writes in, and pretending otherwise would waste your money. Symbility now sits under Cotality after the CoreLogic rebrand in March 2025. If your carrier requires it, say so at intake and you are told before anything is billed.

Money mechanics

What is O&P and when does a contractor get it?

Overhead and profit is a separate figure applied on top of line items, because Xactimate line items are built without general contractor overhead and profit inside them. The convention is that it applies where a job needs three or more trades coordinated. That is an industry norm, not a law, and the carrier decides.

What is the difference between RCV and ACV?

Replacement cost value is what it costs to replace the damaged property today. Actual cash value is that figure minus depreciation for age and condition. Recoverable depreciation is released once the work is completed and documented. Non recoverable depreciation is never paid.

Why did the adjuster reject my Xactimate estimate?

Most rejections are mechanical rather than substantive: the wrong price list or the wrong month, a regional list that does not match the loss zip, quantities that do not reconcile to the sketch, overlapping items on one surface, unsupported minimums, or scope past the stated cause of loss.

Which price list will my estimate be written on?

The one you name. If you name none, the list published for the month the loss happened, in the region the zip falls in. Either way the version, effective date and region appear in the fixed quote before you approve it, and again on the delivered file and the assumptions sheet.

Working with us

Is outsourcing estimate writing the same as hiring a public adjuster?

No, and the difference matters legally. A public adjuster is licensed to represent an insured and negotiate a claim. We write the estimate document and hand it to you. There is no contact with your adjuster, no negotiation and no claim advocacy, on any file.

What documentation do you need to write an insurance estimate?

At minimum the claim number, carrier, date and cause of loss, deductible, loss zip and room by room photos. For a dried structure add the moisture map, daily readings, equipment placement and run days. A scan or an EagleView report makes the sketch faster and more defensible.

Can you write a supplement on an estimate somebody else wrote?

Yes, and it is common. Send the approved estimate, ideally as an ESX rather than a PDF, plus the new evidence: demolition photos, the code section, the readings. The supplement is written against the delta rather than rebuilding the file, and quoted that way.

Do you handle mitigation invoices as well as rebuild estimates?

Yes, and they are written as two documents because they come from different evidence. Mitigation comes from the drying log, equipment days and monitoring visits. The rebuild comes from the sketch. Ordered together, both use one set of room names so they reconcile.

One claim file,
one fixed price

Send the loss, the photos and whatever documentation exists. An estimator reads it, names the price list, prices the work as one figure, and writes nothing until you approve that figure.

Get a fixed quote
STEP 1 OF 2
What do you need?
Project type
When is your bid due?
Describe your scope
Under a minute · No account, no payment
Rather talk it through? Call +1 (510) 810-0346 or book a 15-minute scope call. Not ready? See a real anonymized package first.