Judge the work, not the sales page.
Every package on this shelf, including each sample construction estimate and sample takeoff report, came off a job this desk actually priced, with project names, addresses and bid amounts stripped out. Build an estimate sample package for what you bid and it lands in your inbox.
What lands in your inbox
- The editable workbook, unlocked, with the formulas left in
- The color-coded plan markups the quantities were measured on
- The written assumptions, inclusions and exclusions sheet
- A cover note naming the drawing revision it was built against
Four ways to find the sample construction estimate that looks like your job.
The same catalog, re-shelved. Nothing is hidden when you switch, only rearranged.
Tell us what you bid and we will build the set.
Full bid packages3
Every trade on the job, measured and priced, in one workbook.
Single-trade takeoffs10
One trade, measured off the set, for a sub bidding its own scope.
Material buy lists3
Procurement-ready quantities with waste and coverage applied.
Conceptual and budget estimates2
An early number off partial drawings, with the basis written down.
Insurance claim scopes2
A room-by-room loss scope written to the carrier price list for the loss ZIP and month.
Prevailing wage bid packages2
The labor line built off a published determination, classification by classification.
Steel detailing sets2
Shop and erection drawings with the advance bill of material behind them.
CPM schedules2
A logic-driven baseline with the critical path and float shown.
Bid desk deliverables2
What an outsourced bid department hands back: leveled quotes, a bid board and a forms pack.
You have a live bid and a date. That is a better test than any sample.
Send the drawings and an estimator comes back with a fixed price and a delivery date scheduled against your bid date.
Four documents in an estimate sample package, and one of them is the one that matters.
Every full bid and single-trade package on the shelf holds the same four things, whatever the trade.
The workbook
Editable XLSX, one tab per trade with a roll-up on the front, coded to CSI or to your template if you send one. Pricing sits on its own columns so a reader can strip it out and drop their own in.
The marked-up sheets
Color-coded PDFs with a legend on every sheet. Each color maps to a line in the workbook.
The assumptions sheet
What was assumed, what was included and what was excluded, written per trade rather than as one page for the whole job. This is the tab that decides whether a package is honest, and it is the first one worth reading.
The delivery note
A short cover page: which drawing revision and which addenda the package was built against, who measured it, who checked it, and what would have to change if a later addendum lands.
What gets removed, and what deliberately does not.
A sample is only useful if it is the real document. It is only shareable if nobody can work out whose job it was.
Five things to check in a sample takeoff report, whoever you are buying from.
Put a package from this shelf beside whatever you use now and check the same five things on both. Also check that the scopes a bid usually loses money on (hoisting, temporary protection, fire caulk, patching after other trades, restocking) are either priced or named in the exclusions.
| Traceability | A total with no way back to the drawing it came from | Every quantity color-keyed to a labeled markup on a named sheet |
|---|---|---|
| Scope honesty | Exclusions implied by leaving things out | A written assumptions, inclusions and exclusions sheet per trade |
| Version control | No statement of which drawing revision was priced | Drawing revision and addenda log on the cover of every package |
| Who checked it | One pass, no reviewer named | Estimator self-check, then an independent second estimator, both named |
| What happens next | Silence after delivery | Revisions on unchanged scope included, direct line to the estimator |
A sample proves the format. Your own drawings prove the desk.
Upload a set, get a fixed quote and a delivery date in writing.
What people ask before they hand over an email address.
You have seen the format.
Now put a real bid through it.
Send the drawings and your bid date. You get a fixed quote and a delivery date in writing, and nothing is billed until you approve them in writing.