Skip to main content
Takeoff Services LLC
Where Bidders Win
MEASUREMENT ONLY

Quantity Takeoff Services That Trace Back to the Sheet

Quantity takeoff services for estimators who already hold their own rates, from a team that works as an extension of yours: line-item counts, lengths, areas and volumes read off your drawing set before a dollar is attached to any of them. Every figure carries the sheet number and the markup it came from, so you can check it in seconds rather than take it on trust.

24-96h after the 50% start payment Two-step QA on every package CSI 01-49, all 50 states
PDF or ZIP up to 25 MB, or a Drive, Dropbox or OneDrive link for a set of any size. NDA signed on request.

What ships with the quantity file

  • Editable Excel or CSV, sortable and extendable
  • Color-coded marked-up PDF set, one color per condition
  • Assumptions, inclusions, exclusions, open questions
  • Sheet number on every line, so any figure can be audited
  • One division alone or the full multi-trade set
One fixed price for the divisions you name, agreed before a condition is drawn.
24-96h
Delivery after the 50% start payment
7,500+
Projects measured
1,600+
Contractors served
CSI 01-49
Divisions covered
50
States covered
START HERE

What quantity takeoff services cover, and where measurement stops

Three questions estimators ask before they send a set.

What is a quantity takeoff?

A quantity takeoff is the audited scope of work expressed as numbers: every condition on the drawing set resolved to a quantity and a unit, with the sheet and the markup that produced it recorded beside it. It is finished when every condition has either a quantity or a written reason it does not. That is the whole job of quantity takeoff services, and it stops where price begins.

Who orders the measurement without the pricing?

Specialty subs who already hold their labor and material rates, general contractors checking a sub's numbers before award, and developers, architects and owners who need early-scope quantities. If the pricing is yours, the measurement is the only part worth sending to a quantity takeoff company, and it is the part that eats the week in front of a bid date.

How fast does it come back?

Delivery runs 24 to 96 hours after the 50 percent start payment. The date is set against your bid date at the quote stage, so you know it before you commit, and a multi-division package can be staged so the trades on your critical path land first.

Get my quantities quoted
THE FOUR MEASUREMENTS

Count, linear, area, volume: the four measurements behind every number

Every construction quantity takeoff reduces to one of four measurement types.

EA

Count

Devices, fixtures, doors, frames, hangers, anchors, connection plates, cleanouts. Counted against the schedule mark rather than the plan symbol, so an item drawn on a floor plan, a ceiling plan and a detail is counted once instead of three times.

LF

Linear

Conduit, pipe, duct, base, curb, guardrail, plates, joint reinforcement, edge form. Measured to the routing shown, with drops, risers and offsets taken off the riser diagram instead of averaged into the horizontal run.

SF and SY

Area

Board, sheathing, flooring, roofing, paving, formwork contact area, split by assembly so nothing averages. Drywall takeoff services are the clearest case: board separates by layer, thickness, type and finish level, because one gross wall area hides three different labor units.

CY and TON

Volume and weight

Concrete, grout, cut and fill, aggregate, rebar tonnage, steel by member weight. A concrete quantity takeoff reports cubic yards by placement, with bar taken off the reinforcing schedules, lap splices read from the schedule or the structural notes, and chairs counted from the support spacing the notes or specifications call for, rather than assumed as a percentage of the pour.

Get my quantities quoted
CSI 03 TO 33

What gets measured on the set, division by division

The measurement itself, trade by trade.

CSI divisions 03 to 09 and 31 to 33.
Cast-in-place concrete (CSI 03)Cubic yards by placement, not one gross pour, reinforcement counted off the schedule.Footings, slabs and vertical work; reinforcement and embeds
Masonry (CSI 04)Unit counts by wall type, grout and reinforcement carried against the wall they serve.CMU and structural block; brick, stone and veneer
Structural and miscellaneous metals (CSI 05)Member by member off the framing plans and connection details, in the weight a fabricator buys in.Beams, columns, joists and deck; stairs, rails and supports
Wood, framing and composites (CSI 06)Framing quantities in the units a lumber package is actually built from.Dimensional framing and sheathing; engineered lumber and trusses
Thermal and moisture protection (CSI 07)Roof, wall and below-grade assemblies measured by layer, not as one envelope number.Roofing, flashing and insulation; barriers, sealant and firestopping
Openings (CSI 08)Every opening matched to its mark so hardware and glazing never go missing.Doors, frames and hardware sets; storefront, curtain wall and glazing
Finishes (CSI 09)Tied to the finish schedule and the room, never to a gross floor area.Framing, board and ceilings; flooring, base, paint and coatings
Earthwork (CSI 31)Volumes calculated from existing and proposed grades, not lifted from a summary note.Cut, fill and site preparation with shrink and swell stated as a factor; clearing, erosion control and shoring
Utilities and paving (CSI 32-33)Runs measured to the profile, structures counted to the schedule, surfaces split by section.Storm, sanitary, water, site electrical; paving, curb and site concrete
Hover or tab a column heading to widen that column.
Trade not on the list? Send the sheets and coverage comes back in writing with the price.Get my divisions measured
CSI 21-28

MEP takeoff services: what gets measured in divisions 21 to 28

Mechanical, electrical and plumbing carry the most parts per square foot and the least tolerance for a guess. Our MEP takeoff services quantify all three, ordered on their own or measured alongside the rest of the set.

Electrical takeoff services

One-line, panel schedules and floor plans read together, so feeder sizes and conductor counts come from the one-line and the schedules, and horizontal lengths are scaled from the routed plans.

Raceway and conductor

CSI 26

Conduit and wire on separate lines by size and type, because a change in either moves the labor unit.

  • Branch and homerun conduit

    Runs by trade size and material, EMT, rigid, PVC and MC kept apart, supports counted against the run.

Devices, fixtures and gear

CSI 26-28

Counted by type mark and reconciled against the schedules before the file ships. Communications and fire alarm devices are counted here, on their own lines.

  • Lighting

    Fixtures by type mark off the schedule and ceiling plan, emergency, exit and exterior on their own lines.

Mechanical and HVAC

Air side and water side quantified apart, so a duct revision leaves the piping lines alone when the addendum lands.

Ductwork and air distribution

CSI 23

Sheet metal reported both ways, footage and calculated weight, because some shops bid by the foot and some by the pound.

  • Fittings, transitions and flex

    Elbows, tees, takeoffs and dampers counted by type instead of buried in a straight-duct total.

Equipment and piping

CSI 23

Equipment by schedule mark, piping by size and material with insulation carried against it.

Plumbing and fire protection

Fixtures reconciled against the plumbing schedule and the architectural plans, so one that appears on only one becomes a question.

Piping by system

CSI 22

Every system on its own lines, measured by diameter and by material.

Fixtures, carriers and supports

CSI 22

Counted by mark and reconciled to the plumbing and architectural sheets together.

Fire protection

CSI 21

Measured where the drawings show a laid-out system, flagged where the set leaves it performance-specified.

  • Sprinkler piping and heads

    Main, branch and drop piping by diameter, heads by type and temperature rating, hangers and bracing as drawn.

Lighting plan takeoff markup with a colored dot for each fixture and a legend of fixture counts by type
Electrical takeoff markup on a first floor lighting plan: each dot is one counted fixture, and the legend totals every fixture type.
This is the package most often ordered on its own.Quote my MEP package
TRY ONE SET

Send one drawing set and see the price first

Coverage, the fixed price and the delivery date come back in writing before a single condition is drawn.

Get my quantities quoted See how it works
TRACEABILITY

How a number gets tied to a drawing

A quantity you cannot audit is a quantity you have to take on faith.

STEP 1

The scale is verified first

Every sheet is checked against a known dimension before a measurement is taken. A sheet that plots out of scale, or a title block that disagrees with the geometry, comes back as a flag rather than a measurement taken through the problem.

STEP 2

Each condition gets one color and one name

Conditions are measured in PlanSwift and marked up in Bluebeam, one color and one label each. A type X wall is not the color of a type B, and a slab on grade is not the color of an elevated deck.

STEP 3

The label carries into the workbook

Every line carries its markup label and the sheet it was read from. Read a figure in Excel, find the color on the drawing, and you are looking at the geometry that produced it.

STEP 4

Quantities reconcile sheet by sheet

Totals roll up per sheet before they roll up per trade. A sheet nobody measured shows as a visible gap instead of quietly pulling a total down, which is the failure mode that surfaces on site.

Open a real anonymized package and check a figure back to the drawing yourself.See sample deliverables
METHOD

What gets counted, what gets calculated, and what comes back as a question

Counting, calculating and flagging are three different operations.

How each kind of quantity is produced, and what you see on the line.
Devices, fixtures, doorsCounted by markSchedules first, plans secondEA, with the mark on the line
Rebar and structural steelCalculated from schedulesBar and framing schedulesTON, plus member counts
Performance-specified scopeNot measuredSpec sections, design-build notesWritten exclusion with the reason
Conflicting or missing detailNot assumedWherever the conflict sitsDated open question, before the bid
Hover or tab a column heading to widen that column.
Every line in the file tells you which of these it is.Get my quantities quoted
STUCK ON SCOPE

Ask before you upload, not after the bid

Not sure whether a division is worth measuring, or how a performance-specified scope would come back?

Ask an estimator Call +1 (510) 810-0346
WHEN THE SET DISAGREES

How conflicts between plan, section, schedule and spec are resolved

A drawing set is written by several people and issued in pieces. Disagreements are normal. What matters is whether they get recorded or absorbed.

Plan says one thing, section says another. Which wins?

The more specific document governs, so a wall section beats a plan graphic and a detail beats a section. The choice is written on the assumptions sheet with the sheet numbers on both sides, so you can overrule it in five seconds if you read the set differently.

What if the schedule and the plan show different counts?

Both get counted and the difference gets named. Fixtures, doors and equipment are reconciled against their schedule before the file ships, and where the two disagree you get the schedule count, the plan count and a question, rather than one number hiding the other.

Send my drawing set
WORKED EXAMPLE

One scope, measured end to end

What happens between an upload and a delivered file, walked through on a single realistic scope. This is a composite of typical work, not a client project.

Take a two-story shell and core with a 38,000 square foot footprint: cast-in-place foundations, structural steel above, a single-ply roof and storefront on two elevations. The set arrives as a 96-sheet PDF at the 90 percent issue, bid date eleven days out, divisions 03, 05, 07 and 08 ordered.

Concrete goes by placement: footings and grade beams off the foundation plan and footing schedule, slab by area and thickness with thickened edges on their own lines, form contact area by face, rebar off the bar schedule in tons. Steel is taken member by member and reported as footage and weight. Roofing splits into membrane area by slope, two insulation layers, edge metal by the foot, curbs counted. Openings come off the door and frame matrix by mark, hardware by set number, storefront by elevation.

The set disagrees with itself twice. The roof plan shows a mechanical curb the framing plan does not, and a door mark on the finish plan is missing from the schedule. Both leave as dated questions with the sheet numbers attached.

Get my quantities quoted
SCOPE LIMITS

What the measured scope deliberately leaves out

A file that quietly includes things it should not is worse than one that stops at a clear line.

Unit prices, labor rates, material costs and equipment. No dollar figure in the file.
Burden, overhead and profit, and every markup sitting on top of them.
Waste, overage and rounding up to the lengths and pack sizes a vendor sells.
Crew sizes, production rates and durations, which belong to a schedule.
Scope shown as by others, deferred to design-build, or performance-specified with no layout.
Anything the set does not resolve well enough to measure honestly, raised as a question.
If you are past the award and need one document three vendors can price line for line, that is a different deliverable.See material takeoff services
BIDDING SEVERAL JOBS

Put the measuring on a monthly partnership

Shops sending several sets a month get a priority queue, addenda recalculations included, and the same divisions, condition names and markup format on every package.

Get my quantities quoted How quotes work
QUALITY CONTROL

Two-step QA: what the second estimator actually recomputes

Every package is checked twice, by two people, against the drawings rather than against the first estimator's spreadsheet. Two steps, not three, and the same two on one division as on a full set.

Step one: the estimator self-check

The estimator who measured the job reruns their own work before the package leaves their desk. Every sheet that carried a measurement is checked against its dimension string a second time. Two markups on the same geometry are found, one is removed, the totals rerun. Runs that stop at a match line and never resume on the next sheet are traced across.

Step two: the independent audit

A second estimator who did not measure the job audits it against the drawing set itself. The auditor recalculates conditions cold from the sheets rather than reading the first numbers back. Selected areas, volumes and runs are remeasured from the drawings and compared against the file. Nothing leaves until the workbook, the markups and the written scope agree with each other. Anything visible on the sheets and absent from the file must appear on the exclusions list, or it goes back.

Get my quantities quoted
WHAT LANDS IN YOUR INBOX

The file, the markups, and how it lands in your system

Editable, labeled, and formatted the way your office already works.

What ships on every package

Three files, on one division and on twenty.

Editable Excel and CSV

Working file

A live, unlocked workbook you can sort, filter and extend with your own pricing columns, delivered in your template or coded to CSI 01-49, whichever your cost codes expect. One row per condition, one column per field, no merged cells and no header art sitting above the data.

Color-coded marked-up drawings

Proof

The full marked-up PDF set, one color and one label per condition, on every package rather than only the large ones. It turns a spreadsheet figure into something you can point at in a scope meeting.

Assumptions, inclusions and exclusions

Scope record

One page: every judgment call, everything measured by division and sheet, everything visible and deliberately not measured with its reason, and every open question with the date it was raised.

Get my quantities quoted
FAQ

Questions estimators ask before they upload

What estimators ask about quantity takeoff services before they upload a set.

Scope and coverage

Can you measure one division on its own?

Yes. Name the divisions at upload and the fixed quote covers that scope only. A single division is quoted the same way a full CSI 01-49 package is, and the two-step check runs on both. Everything you did not order is named on the exclusions sheet.

Do you measure demolition and existing conditions on a renovation set?

Where the set documents them. Demolition plans, as-built sheets and existing condition drawings are measured like any other sheet. Where a condition exists on site but appears on no drawing, it leaves as an exclusion with the reason rather than as an estimated number.

What if a division we ordered barely exists on the set?

You hear about it before you are billed. Scope is confirmed against the actual drawings when the quote is built, so a division with almost nothing in it gets raised then rather than delivered as an empty tab. The quote is adjusted to what is really there.

Drawings we can measure

Do you measure from a scanned or photographed set?

Only if it is scale-verifiable. Every sheet is checked against a known dimension before a measurement is taken, and a scan that will not verify comes back as a flag rather than a number taken through the problem.

Can you measure a set that is still under revision?

Yes, and it is common. We measure the current issue and record the issue date on the assumptions sheet, then remeasure the affected conditions when the revision lands. Revisions on unchanged scope are included, so a set that moves twice does not become three invoices.

Do you work from a Revit or IFC model instead of drawings?

Alongside the drawings rather than instead of them. The sheets still govern, so exported quantities are checked against the drawings and anything the model and the set disagree on leaves as a written question.

Accuracy and method

How are typical details and repeated units handled?

A typical is measured once and extended by count, and the extension is written down: which bay, unit or floor it came from, and how many times it was applied.

How do alternates and unit-price items come back?

On their own lines, never folded into the base scope. Each alternate is measured as a separate condition with its own markup color, and unit-price items are reported in the unit the bid form asks for, so the figures transfer without a conversion step.

What happens if we disagree with a figure after delivery?

Point at the line. It names its markup and its sheet, so the geometry behind it opens in seconds and the disagreement becomes a specific one. If it is a measurement error we rerun it, and revisions on unchanged scope are included on every engagement.

Files, delivery and what comes next

Do we get the takeoff software files, or only the spreadsheet?

The workbook and the marked-up PDF set ship with every package. Source files from the takeoff software are available on request at the quote stage, so your own estimator can open the conditions, extend them and keep working in the same file instead of rebuilding it.

Can you name conditions to match the codes our software already uses?

Yes. Send your condition list, cost code structure or the spreadsheet your office bids from, and the markups and workbook lines are named to it from the first sheet. A multi-building or phased job comes back subtotalled the way you bid it, not as one flat total somebody on your side has to split afterwards.

Can we test you against a job we have already measured?

Send a set your own desk already took off and name the divisions. You get an independent measured file with the markups behind every figure to compare line for line. It is quoted like any other package: fixed price, approved in writing, nothing billed until you approve it.

Can you price the quantities after you measure them?

Yes, as a separate step. It is built from the same measured file rather than started again from the drawings, so every figure keeps the sheet and markup it came from, and it is quoted on its own before it starts.

Send the drawings, get your quantities quoted

Name the divisions you want measured and your bid date.

Get my quantities quoted
STEP 1 OF 2
What do you need?
Project type
When is your bid due?
Describe your scope
Under a minute · No account, no payment
Rather talk it through? Call +1 (510) 810-0346 or request a call back. Not ready? See a real anonymized package first.