Skip to main content
✉ Email plans to kb@takeoffservicesllc.net for a quick quote, or upload through the form belowReplies within 30 minutesEstimating desks covering all 50 states
TS
Takeoff Services LLC
Where Bidders Win
MEASUREMENT ONLY

Quantity Takeoff Services That Trace Back to the Sheet

Quantity takeoff services for estimators who already hold their own rates: counts, lengths, areas and volumes read off your drawing set before a dollar is attached to any of them. Every figure carries the sheet number and the markup it came from, so you can check it in seconds rather than take it on trust.

24-96h from an approved quote Two-step QA on every package CSI 01-49, all 50 states
PDF or ZIP up to 25 MB, or a Drive, Dropbox or OneDrive link for a set of any size. NDA signed on request.

What ships with the quantity file

  • Editable Excel or CSV, sortable and extendable
  • Color-coded marked-up PDF set, one color per condition
  • Assumptions, inclusions, exclusions, open questions
  • Sheet number on every line, so any figure can be audited
  • One division alone or the full multi-trade set
One fixed price for the divisions you name, agreed before a condition is drawn.
24-96h
Delivery from approved quote
7,500+
Projects measured
1,600+
Contractors served
CSI 01-49
Divisions covered
50
States covered
START HERE

What quantity takeoff services cover, and where measurement stops

Four questions estimators ask before they send a set. Answered straight, no preamble.

What is a quantity takeoff?

A quantity takeoff is the audited scope of work expressed as numbers: every condition on the drawing set resolved to a quantity and a unit, with the sheet and the markup that produced it recorded beside it. It is finished when every condition has either a quantity or a written reason it does not. That is the whole job of quantity takeoff services, and it stops where price begins.

What does a measured package cost?

It is quoted per package from your actual drawings as one fixed figure, approved in writing before measuring starts. What moves it is the number of divisions you order and how much the set resolves, not how many sheets it runs to. Nothing is billed until you approve the number and the delivery date together.

Who orders the measurement without the pricing?

Specialty subs who already hold their labor and material rates, and general contractors checking a sub's numbers before award. If the pricing is yours, measurement is the only part worth sending out, and it is the part that eats the week in front of a bid date.

How fast does it come back, and what does it cost?

Delivery runs 24 to 96 hours from an approved quote, and the date is set against your bid date at the quote stage so you know it before you commit. Price is fixed per package and agreed in writing before measurement starts, so the number you see is the number you pay.

Send one sheet or the whole set. You get the scope, the number and the date in writing before anything starts.Get my quantities quoted
THE FOUR MEASUREMENTS

Count, linear, area, volume: the four measurements behind every number

Every construction quantity takeoff reduces to one of four measurement types. Which one a scope belongs to decides the unit it ships in, and getting that wrong is the first thing that breaks when a bid is measured by eye.

EA

Count

Devices, fixtures, doors, frames, hangers, anchors, connection plates, cleanouts. Counted against the schedule mark rather than the plan symbol, so an item drawn on a floor plan, a ceiling plan and a detail is counted once instead of three times.

LF

Linear

Conduit, pipe, duct, base, curb, guardrail, plates, joint reinforcement, edge form. Measured to the routing shown, with drops, risers and offsets taken off the riser diagram instead of averaged into the horizontal run.

SF and SY

Area

Board, sheathing, flooring, roofing, paving, formwork contact area, split by assembly so nothing averages. Drywall takeoff services are the clearest case: board separates by layer, thickness, type and finish level, because one gross wall area hides three different labor units.

CY and TON

Volume and weight

Concrete, grout, cut and fill, aggregate, rebar tonnage, steel by member weight. Concrete takeoff services report cubic yards by placement, with reinforcement counted off the schedule rather than assumed as a percentage of the pour. Fabricators going from the member list into shop drawings carry the same schedule forward.

A single division or the whole set, measured in the units your bid form asks for.Get my quantities quoted
CSI 03 TO 33

What gets measured on the set, division by division

The measurement itself, trade by trade, in the unit each line ships in. Mechanical, electrical and plumbing get their own section below.

Concrete, masonry and metals

The load path, quantified before anything gets hung on it.

Cast-in-place concrete

CSI 03

Cubic yards by placement, not one gross pour, reinforcement counted off the schedule.

  • Footings, slabs and vertical work

    Volume by element, slab area and thickness by pour, thickened edges separate, form contact area by face.

  • Reinforcement and embeds

    Rebar tonnage by bar size, welded wire area, dowels, chairs, embeds and blockouts counted.

Masonry

CSI 04

Unit counts by wall type, grout and reinforcement carried against the wall they serve.

  • CMU and structural block

    Counts by nominal size and wall type, bond beam and lintel block, grout volume by cell spacing.

  • Brick, stone and veneer

    Face area by unit type, ties and anchors counted, flashing, weep and control joint footage.

Structural and miscellaneous metals

CSI 05

Member by member off the framing plans and connection details, in the weight a fabricator buys in.

  • Beams, columns, joists and deck

    Footage and calculated weight by shape, joists by mark, bridging, deck area by profile and gauge.

  • Stairs, rails and supports

    Flights and landings by mark, rail footage by type, lintels, bollards and equipment supports.

Wood, envelope and openings

Where a bid leaks when the number comes from a glance rather than a measurement.

Wood, framing and composites

CSI 06

Framing quantities in the units a lumber package is actually built from.

  • Dimensional framing and sheathing

    Stud counts by wall type and height, plates, headers, blocking, sheathing area, board feet by size.

  • Engineered lumber and trusses

    LVL, PSL and glulam by mark and length, trusses by profile, hangers and connectors by type.

Thermal and moisture protection

CSI 07

Roof, wall and below-grade assemblies measured by layer, not as one envelope number.

  • Roofing, flashing and insulation

    Roof area by system and slope, insulation by layer and R-value, edge metal footage, curbs counted.

  • Barriers, sealant and firestopping

    Waterproofing and air barrier area, sealant joints by length and size, firestop by penetration type.

Openings

CSI 08

Every opening matched to its mark so hardware and glazing never go missing.

  • Doors, frames and hardware sets

    Door and frame matrix by opening mark, frame type split out, hardware listed by set number.

  • Storefront, curtain wall and glazing

    Storefront and curtain wall area by elevation, glazing footage by edge condition, coiling doors by mark.

Finishes, earthwork and site

Finish schedule first, then the civil sheets and the volumes nobody wants to run.

Finishes

CSI 09

Tied to the finish schedule and the room, never to a gross floor area.

  • Framing, board and ceilings

    Stud framing by size, gauge and height, board area by layer and type, grid and hard-lid area.

  • Flooring, base, paint and coatings

    Flooring by material and room, base footage by type, surface area by substrate and coat count.

Earthwork

CSI 31

Volumes calculated from existing and proposed grades, not lifted from a summary note.

  • Cut, fill and site preparation

    Volumes by surface comparison, topsoil strip and respread, undercut, shrink and swell stated as a factor.

  • Clearing, erosion control and shoring

    Clearing area and tree counts, silt fence and inlet protection footage, shoring area as sectioned.

Utilities and paving

CSI 32-33

Runs measured to the profile, structures counted to the schedule, surfaces split by section.

  • Storm, sanitary, water, site electrical

    Pipe by diameter and material to profile length, structures by number, duct bank by size, bedding volume.

  • Paving, curb and site concrete

    Paving area by section and thickness, base volume, curb footage by type, walks, pads, striping.

Trade not on the list? Send the sheets and coverage comes back in writing with the price.Get my divisions measured
CSI 21-28

MEP takeoff services: what gets measured in divisions 21 to 28

Mechanical, electrical and plumbing carry the most parts per square foot and the least tolerance for a guess. Our MEP takeoff services quantify all three, ordered on their own or measured alongside the rest of the set.

Electrical takeoff services

One-line, panel schedules and floor plans read together, so feeders come from the schedule instead of a scaled plan run.

Raceway and conductor

CSI 26

Conduit and wire on separate lines by size and type, because a change in either moves the labor unit.

  • Branch and homerun conduit

    Runs by trade size and material, EMT, rigid, PVC and MC kept apart, supports counted against the run.

  • Feeders and risers

    Lengths from the one-line and riser diagram, conductors per run, vertical drops measured rather than allowed.

  • Boxes, fittings and tray

    Junction and pull boxes by size, fittings by type, cable tray and wireway by the foot.

Devices, fixtures and gear

CSI 26-28

Counted by type mark and reconciled against the schedules before the file ships. Communications and fire alarm devices are counted here, on their own lines.

  • Devices and low voltage

    Receptacles, switches, data drops and sensors by mark, split by system so fire alarm never sits on a lighting line.

  • Lighting

    Fixtures by type mark off the schedule and ceiling plan, emergency, exit and exterior on their own lines.

  • Panels, gear and grounding

    Panelboards, switchboards, transformers and disconnects off the schedules, reconciled to the one-line, plus bonding.

Mechanical and HVAC

Air side and water side quantified apart, so a duct revision leaves the piping lines alone when the addendum lands.

Ductwork and air distribution

CSI 23

Sheet metal reported both ways, footage and calculated weight, because some shops bid by the foot and some by the pound.

  • Duct by size and gauge

    Supply, return, exhaust and outside air by size and gauge, rectangular and round apart, liner and wrap carried.

  • Fittings, transitions and flex

    Elbows, tees, takeoffs and dampers counted by type instead of buried in a straight-duct total.

  • Grilles, registers and diffusers

    By mark off the schedule and ceiling plan, neck size and mounting type carried on the line.

Equipment and piping

CSI 23

Equipment by schedule mark, piping by size and material with insulation carried against it.

  • Units and terminal equipment

    Rooftop units, air handlers, VAV boxes, fan coils, exhaust fans and pumps by mark, curbs and isolation listed.

  • Hydronic and refrigerant piping

    Chilled, hot, condenser water and refrigerant by diameter and material, valves and hangers counted, insulation by size.

Plumbing and fire protection

Fixtures reconciled against the plumbing schedule and the architectural plans, so one that appears on only one becomes a question.

Piping by system

CSI 22

Every system on its own lines, measured by diameter and by material.

  • Domestic water

    Hot, cold and recirculation by diameter and material, valves counted, insulation footage carried against the pipe.

  • Sanitary, vent and storm

    Waste, vent and storm by diameter and material, cleanouts and drains by mark, roof drains against the area served.

  • Gas and specialty gas

    Runs by diameter and material, regulators, valves and outlets counted where the specialty sheets show them.

Fixtures, carriers and supports

CSI 22

Counted by mark and reconciled to the plumbing and architectural sheets together.

  • Fixtures and trim

    Water closets, urinals, lavatories, sinks, showers and hose bibbs by mark, trim and carriers listed against each.

  • Heaters, pumps and hangers

    Heaters, tanks, pumps and backflow preventers by mark, hanger spacing taken from the spec rather than assumed.

Fire protection

CSI 21

Measured where the drawings show a laid-out system, flagged where the set leaves it performance-specified.

  • Sprinkler piping and heads

    Main, branch and drop piping by diameter, heads by type and temperature rating, hangers and bracing as drawn.

  • Risers, valves and standpipes

    Riser assemblies, control and check valves, flow switches and hose valves by mark, located to the sheet.

This is the package most often ordered on its own. Send the mechanical, electrical or plumbing sheets and nothing else.Quote my MEP package
TRY ONE SET

Send one drawing set and see the price first

Name the divisions and your bid date. Coverage, the fixed price and the delivery date come back in writing before a single condition is drawn.

Get my quantities quoted See how it works
TRACEABILITY

How a number gets tied to a drawing

A quantity you cannot audit is a quantity you have to take on faith. Nothing in the file is a total you are asked to trust blind.

STEP 1

The scale is verified first

Every sheet is checked against a known dimension before a measurement is taken. A sheet that plots out of scale, or a title block that disagrees with the geometry, comes back as a flag rather than a measurement taken through the problem.

STEP 2

Each condition gets one color and one name

Conditions are measured in PlanSwift and marked up in Bluebeam, one color and one label each. A type X wall is not the color of a type B, and a slab on grade is not the color of an elevated deck.

STEP 3

The label carries into the workbook

Every line carries its markup label and the sheet it was read from. Read a figure in Excel, find the color on the drawing, and you are looking at the geometry that produced it.

STEP 4

Quantities reconcile sheet by sheet

Totals roll up per sheet before they roll up per trade. A sheet nobody measured shows as a visible gap instead of quietly pulling a total down, which is the failure mode that surfaces on site.

STEP 5

The markups ship with the file

The full color-coded marked-up PDF set is delivered with the workbook on every package, one trade or twenty. Not an upgrade, and not something you ask for.

This is the part worth judging before you buy. Open a real anonymized package and check a figure back to the drawing yourself.Get my fixed quote
METHOD

What gets counted, what gets calculated, and what comes back as a question

Counting, calculating and flagging are three different operations. Mixing them up is how a takeoff ends up confident and wrong.

How each kind of quantity is produced, and what you see on the line.
Devices, fixtures, doorsCounted by markSchedules first, plans secondEA, with the mark on the line
Rebar and structural steelCalculated from schedulesBar and framing schedulesTON, plus member counts
Performance-specified scopeNot measuredSpec sections, design-build notesWritten exclusion with the reason
Conflicting or missing detailNot assumedWherever the conflict sitsDated open question, before the bid
Hover or tab a column heading to widen that column.
Every line in the file tells you which of these it is.Get my quantities quoted
STUCK ON SCOPE

Ask before you upload, not after the bid

Not sure whether a division is worth measuring, or how a performance-specified scope would come back? Talk it through with an estimator first.

Ask an estimator Call +1 (510) 810-0346
WHEN THE SET DISAGREES

How conflicts between plan, section, schedule and spec are resolved

A drawing set is written by several people and issued in pieces. Disagreements are normal. What matters is whether they get recorded or absorbed.

Plan says one thing, section says another. Which wins?

The more specific document governs, so a wall section beats a plan graphic and a detail beats a section. The choice is written on the assumptions sheet with the sheet numbers on both sides, so you can overrule it in five seconds if you read the set differently.

What if the schedule and the plan show different counts?

Both get counted and the difference gets named. Fixtures, doors and equipment are reconciled against their schedule before the file ships, and where the two disagree you get the schedule count, the plan count and a question, rather than one number hiding the other.

What happens when an addendum lands mid-measurement?

Send it and the affected conditions are remeasured against it. Only the conditions it touches get reopened, so the rest of the file does not restart, and the issue date on the assumptions sheet moves to the revision you were measured against.

Ask the question before the bid date, not after it.Send my drawing set
WORKED EXAMPLE

One scope, measured end to end

What happens between an upload and a delivered file, walked through on a single realistic scope. This is a composite of typical work, not a client project.

Take a two-story shell and core with a 38,000 square foot footprint: cast-in-place foundations, structural steel above, a single-ply roof and storefront on two elevations. The set arrives as a 96-sheet PDF at the 90 percent issue, bid date eleven days out, divisions 03, 05, 07 and 08 ordered.

Scale is verified against a dimension string on the foundation plan, then on every sheet that will carry a measurement. Two civil sheets plot short and come back flagged. Divisions 31 to 33 were not ordered, so they are noted and set aside rather than quietly measured into the package.

Concrete goes by placement: footings and grade beams off the foundation plan and footing schedule, slab by area and thickness with thickened edges on their own lines, form contact area by face, rebar off the bar schedule in tons. Steel is taken member by member and reported as footage and weight. Roofing splits into membrane area by slope, two insulation layers, edge metal by the foot, curbs counted. Openings come off the door and frame matrix by mark, hardware by set number, storefront by elevation.

The set disagrees with itself twice. The roof plan shows a mechanical curb the framing plan does not, and a door mark on the finish plan is missing from the schedule. Both leave as dated questions with the sheet numbers attached. Two typical bays are extended across nine identical bays, and that extension is written down so it can be checked rather than trusted.

What lands in the inbox
One workbook where every line names its markup and its sheet, the marked-up PDF set colored by division, and one page of assumptions, inclusions, exclusions and open questions. Divisions 31 to 33 sit on the exclusions list with the reason, and delivery lands inside the 24-96 hour window.
Your set will have its own two conflicts. You hear about them before the bid date.Get my quantities quoted
SCOPE LIMITS

What the measured scope deliberately leaves out

A file that quietly includes things it should not is worse than one that stops at a clear line. Here is where that line sits.

Unit prices, labor rates, material costs and equipment. No dollar figure in the file.
Burden, overhead and profit, and every markup sitting on top of them.
Waste, overage and rounding up to the lengths and pack sizes a vendor sells.
Crew sizes, production rates and durations, which belong to a schedule.
Scope shown as by others, deferred to design-build, or performance-specified with no layout.
Anything the set does not resolve well enough to measure honestly, raised as a question.
Divisions you did not order, named on the exclusions sheet so the gap stays visible.
Existing conditions no sheet documents, unless a demolition or as-built drawing shows them.
This page is for measured quantities. If you are past the award and need one document three vendors can price line for line, that is a different deliverable.See material takeoff services
BIDDING SEVERAL JOBS

Put the measuring on a monthly partnership

Shops sending several sets a month get the same divisions, the same condition names and the same markup format on every package, at a monthly rate.

Get my quantities quoted Talk about volume
QUALITY CONTROL

Two-step QA: what the second estimator actually recomputes

Every package is checked twice, by two people, against the drawings rather than against the first estimator's spreadsheet. Two steps, not three, and the same two on one division as on a full set.

Step one: the estimator self-check

The estimator who measured the job reruns their own work before the package leaves their desk.

Rerun and recount

Conditions are rerun rather than re-read, and counts are taken again from the schedules.

  • Scale reverified

    Every sheet that carried a measurement is checked against its dimension string a second time.

  • Counts against schedules

    Fixture, door, equipment and device counts are retaken and compared against the first pass.

Coverage and gaps

The two silent failure modes, double coverage and dropped runs, are hunted deliberately.

  • Double coverage

    Two markups on the same geometry are found, one is removed, the totals rerun.

  • Match line breaks

    Runs that stop at a match line and never resume on the next sheet are traced across.

Step two: the independent audit

A second estimator who did not measure the job audits it against the drawing set itself.

Recomputed, not reviewed

The auditor recalculates conditions cold from the sheets rather than reading the first numbers back.

  • Sample recomputation

    Selected areas, volumes and runs are remeasured from the drawings and compared against the file.

  • Unit and math check

    Units are confirmed correct for the trade and every rollup recalculated from its own lines.

Reconciliation before release

Nothing leaves until the workbook, the markups and the written scope agree with each other.

  • Label to line, both directions

    Every markup label matches a workbook line, and every workbook line matches a markup.

  • Exclusions tested

    Anything visible on the sheets and absent from the file must appear on the exclusions list, or it goes back.

Two people, two passes, every package. Anything that does not reconcile goes back before delivery, not after.Get my quantities quoted
WHAT LANDS IN YOUR INBOX

The file, the markups, and how much of it you order

Editable, labeled, and formatted the way your office already works. Nothing here is a locked total you have to accept on trust.

THE WORKING FILE

Editable Excel and CSV

A live workbook you can sort, filter and extend with your own pricing columns. Nothing is flattened into a locked PDF. Delivered in your template or coded to CSI 01-49, whichever your cost codes expect, with source takeoff files on request at the quote stage.

THE PROOF

Color-coded marked-up drawings

The full marked-up PDF set, one color and one label per condition, on every package rather than only the large ones. It turns a spreadsheet figure into something you can point at in a scope meeting.

THE SCOPE RECORD

Assumptions, inclusions and exclusions

One page: every judgment call, everything measured by division and sheet, everything visible and deliberately not measured with its reason, and every open question with the date it was raised.

SCOPE

One division or the full set

A single division alone, or a multi-trade package spanning CSI 01-49 from sitework through mechanical, electrical and plumbing, in all 50 states. Name what you want at upload and the quote covers that scope only.

IF YOU WANT IT PRICED

The same quantities, priced

Want labor, material, equipment and markup applied to these numbers instead of the numbers alone? That is built from the same measured file rather than started again from the drawings.

See construction estimating services
BEFORE YOU BUY

See a delivered package first

An anonymized quantity package: the workbook with its units and totals live, and the color-coded sheets behind them. Check a length against the plan yourself. Every quantity here is offered to be argued with, which is the point of shipping the markups beside the numbers.

See sample deliverables
STRAIGHT TO FABRICATION

Going from the member list to shop drawings

Fabricators who take the measured member schedule straight into detailing can carry the same file forward instead of rebuilding it. The quantities and the marks stay the ones your erector will read on site.

See structural steel detailing services
Send the set, name your divisions and your bid date. The price and the delivery date come back in writing.Get my quantities quoted
HANDOVER

How the file lands in the software you already run

You hold the pricing, so the measured file has to arrive in a shape your own system can take. This is what ships by default, what can be named at the source, and what you have to ask for before work starts.

What ships on every package

Three files, on one division and on twenty.

Editable Excel and CSV

Working file

Live columns, units and totals. Sort it, filter it, add your own pricing columns, or paste one division straight into your bid form.

  • CSV that imports without a cleanup pass

    One row per condition, one column per field, no merged cells and no header art sitting above the data.

  • Your template instead of ours

    Send the spreadsheet your office bids from and the package comes back inside it rather than beside it.

The color-coded markup set

Proof

One color and one label per condition on the sheet it was measured from, so a figure in the workbook opens as geometry on the drawing.

Assumptions, inclusions, exclusions and open questions

Scope record

One page, delivered with the file, dated to the drawing issue it was measured against.

What to ask for at the quote stage

All three are free to arrange up front and expensive to retrofit.

Source takeoff files

On request

The native file the conditions were built in, so your estimator opens the work, extends it and keeps going instead of rebuilding it from the PDF.

  • Ask before work starts

    Say so with the drawings and the source file travels with the workbook at handover.

Your condition names and cost codes

At the source

Send your condition list or code structure and the markups and workbook lines are named to it from the first sheet. Matching names at the source is what lets a file import cleanly rather than get remapped line by line at your end.

Rollups by area, floor, phase or building

Structure

A multi-building or phased job comes back subtotalled the way you bid it, not as one flat total somebody on your side has to split afterwards.

  • Say how you bid it at upload

    Splitting at delivery costs nothing. Splitting a finished workbook afterwards costs an evening.

Tell us what you run and how you want it named. The quote covers the format as well as the measuring.Get my quantities quoted
FAQ

Questions estimators ask before they upload

What estimators ask about quantity takeoff services before they upload a set.

Scope and coverage

Can you measure one division on its own?

Yes. Name the divisions at upload and the fixed quote covers that scope only. A single division is quoted the same way a full CSI 01-49 package is, and the two-step check runs on both. Everything you did not order is named on the exclusions sheet.

Do you measure demolition and existing conditions on a renovation set?

Where the set documents them. Demolition plans, as-built sheets and existing condition drawings are measured like any other sheet. Where a condition exists on site but appears on no drawing, it leaves as an exclusion with the reason rather than as an estimated number.

What if a division we ordered barely exists on the set?

You hear about it before you are billed. Scope is confirmed against the actual drawings when the quote is built, so a division with almost nothing in it gets raised then rather than delivered as an empty tab. The quote is adjusted to what is really there.

Drawings we can measure

Do you measure from a scanned or photographed set?

Only if it is scale-verifiable. Every sheet is checked against a known dimension before a measurement is taken, and a scan that will not verify comes back as a flag rather than a number taken through the problem. Send what you have and we will tell you first.

Can you measure a set that is still under revision?

Yes, and it is common. We measure the current issue and record the issue date on the assumptions sheet, then remeasure the affected conditions when the revision lands. Revisions on unchanged scope are included, so a set that moves twice does not become three invoices.

Do you work from a Revit or IFC model instead of drawings?

Alongside the drawings rather than instead of them. A model export saves counting, but the sheets still govern, so exported quantities are checked against the drawings before they reach the workbook and anything the model and the set disagree on leaves as a written question rather than as a number.

Accuracy and method

How are typical details and repeated units handled?

A typical is measured once and extended by count, and the extension is written down: which bay, unit or floor it came from, and how many times it was applied. You check one instance and the multiplier instead of auditing forty identical ones.

How do alternates and unit-price items come back?

On their own lines, never folded into the base scope. Each alternate is measured as a separate condition with its own markup color, and unit-price items are reported in the unit the bid form asks for, so the figures transfer without a conversion step.

What happens if we disagree with a figure after delivery?

Point at the line. It names its markup and its sheet, so the geometry behind it opens in seconds and the disagreement becomes a specific one. If it is a measurement error we rerun it, and revisions on unchanged scope are included on every engagement.

Files and delivery

Do we get the takeoff software files, or only the spreadsheet?

The workbook and the marked-up PDF set ship with every package. Source files from the takeoff software are available on request at the quote stage, so your own estimator can open the conditions, extend them and keep working in the same file instead of rebuilding it.

Can you name conditions to match the codes our software already uses?

Yes. Send your condition list or cost code structure with the drawings and the markups and workbook lines are named to it. Matching the names at the source is what lets a file import cleanly instead of being remapped line by line at your end.

Can you deliver in stages so we can start pricing before the whole set is measured?

Yes on multi-division packages. Name the divisions you need first and delivery is staged against your bid date, so the trades on your critical path land while the rest is still being measured. The staging is written onto the quote with the price, not agreed halfway through.

Pricing and trying us

Can we test you against a job we have already measured?

That is the cleanest way to buy this. Send a set your own desk already took off and name the divisions. You get an independent measured file with the markups behind every figure, and you compare it line for line against your own work instead of against a sales claim. It is quoted like any other package: fixed price, approved in writing, nothing billed until you approve it.

What drives the price of a measured package?

The number of divisions and how much the set actually resolves. Sheet count matters less than trade count, and a 90% set with schedules measures faster than a 50% set where half the conditions leave as open questions. The figure comes back in writing before anything starts.

Send the drawings, get your quantities quoted

Name the divisions you want measured and your bid date. Coverage, price and the delivery date are confirmed in writing before a single condition is drawn.

Get my quantities quoted
STEP 1 OF 2
What do you need?
Project type
When is your bid due?
Describe your scope
Under a minute · No account, no payment
Rather talk it through? Call +1 (510) 810-0346 or book a 15-minute scope call. Not ready? See a real anonymized package first.