RESIDENTIAL ESTIMATING DESK

Residential Construction Estimating Services for Builders and Remodelers

Line-item cost for custom homes, spec builds, remodels and wood-framed multifamily, coded to NAHB or CSI and returned as an unlocked spreadsheet you can reprice with your own framer and your own lumber yard. Delivered 24-96 hours from a fixed quote you approve in writing.

24-96h from an approved quote NAHB cost codes or CSI 01-49 3-5% typical variance band
PDF or ZIP up to 25 MB through the form, or a Drive, Dropbox or OneDrive link for a full set. NDA on request, and nothing is billed until you approve a fixed quote.

In every residential package

  • Unlocked Excel or CSV in NAHB cost codes, CSI 01-49, or both
  • An allowance schedule with a unit basis behind every dollar
  • Marked-up sheets in color, keyed to the workbook row
  • Written assumptions, inclusions and exclusions
  • Estimator self-check, then a second-estimator audit
The same two checks on a 1,450 SF spec plan and a 28-unit townhome community.
24-96h
Delivery from an approved quote
3-5%
Typical variance against actuals
7,500+
Projects estimated
1,600+
Contractors served
50
States served remotely
WHY THE JOB LOST MONEY

Where residential margin actually disappears

Almost nobody loses money on a house because the framing number was wrong. The margin goes in small places between the estimate date and the certificate of occupancy, most of them decided before a shovel moves.

A 3% quantity error on a $600,000 house is $18,000, against a gross margin that might have been $80,000 to $110,000.
That error never stays singular. Build the plan forty times and you bought it forty times.
An allowance set low to win the contract, then absorbed at month five, because nobody wrote down who pays the overage or at what markup.
Selections drift. The buyer picks 12x24 porcelain against a $4.50 per SF allowance and nobody prices the leveling system.
Change orders performed and never written. The framer moves a wall on Tuesday and the paperwork never catches up.
Sub scope gaps found at buyout. Nobody carried the shower pans, and on a fixed price contract that lands in your margin rather than the buyer's.
Escalation between the estimate date and the framing order. Lumber does not care that you priced the house in March.
A $185 per SF number carried onto a lot with a six foot fall. Cost per square foot as an input was never a budget.
Waste buried in one lump. Sheathing on a cut-up hip roof wants 15% and a straight gable wants 5%, so one factor across the house is wrong at both ends.
Markup mistaken for margin. A 25% markup is a 20% margin, and on a $600,000 contract that gap is $30,000.
Every one is closed by a document, not by trying harder. The rest of this page is those documents.Price one house
WHAT LANDS IN YOUR INBOX

What our residential estimating services actually deliver

Residential cost estimating services are worth what the file is worth. Here is what lands in your inbox, and the decision that changes which package you should buy.

The four files

The same four parts on one custom home and on a twenty lot release.

The line-item estimate

Excel or CSV

Quantity, unit, unit cost and extension on every line, labor and material split so you can overwrite one without disturbing the other. No locked cells, no rolled-up total hiding a number.

  • A rate column you are meant to overwrite

    Baselines come from RSMeans and the National Construction Estimator, adjusted for the market. Drop your framer's number and your yard's quote into the rate column and the sheet recalculates. You buy quantities and structure, not a price you must take.

  • Coded to your books, not to ours

    NAHB cost codes, CSI 01-49, or both columns on the same sheet. Send your chart of accounts with the plans and the workbook lands in your numbering.

The allowance schedule

Its own tab

Every unselected item with a unit basis, a quantity and a figure. Not $9,000 for flooring: 2,000 SF at $4.50 per SF installed. Overage terms sit beside it, agreed at estimate time, the only time anybody agrees to them calmly.

The color-coded markups

PDF

Every wall run, roof plane and fixture count marked on the sheet it was measured on and keyed to the workbook row. Wall types stay separated: 2x4 and 2x6 exterior, partition, wet wall and rated party wall never average into each other.

Assumptions, inclusions and exclusions

One page

What was counted, what was assumed, what was left out. On a fixed price house this is the page that decides who pays for the thing nobody drew.

Quantities only, or quantities priced

The decision no competitor draws for you, and the one that changes what you should pay.

Quantities only, when you buy the job out

Measured

Collecting sub bids is a pricing method, not an absence of one. What you lack is the measurement that holds a framer to their number, catches the sub who bid off a superseded issue, and shows the scope nobody claimed.

Fully priced, when one number leaves the office

Priced

When a figure goes to a buyer, a bank or your own call on a lot, you need the build-up: crews and production behind the labor rows, allowances with a basis, contingency and escalation on lines you can delete.

See a sample package
Say what the number is for and you will be told which one costs less.Ask an estimator
THE ALLOWANCE SCHEDULE

Allowances, selections and contingency, three different mechanics

These three get collapsed into one line on most residential estimates, and that habit is why fixed price builders argue with their buyers at month five.

How an allowance schedule for a home build carries each mechanic, and whose money is behind it.
AllowanceAn unselected item at a stated unit and quantityThe buyer, at selectionIts own schedule line, with the basis written
SelectionThe product the buyer actually pickedThe buyerReplaces the allowance, with the delta shown
Allowance overageThe gap between the allowance and the pickThe buyer, by change orderCost plus your standard markup, approved first
ContingencyScope and condition risk, not buyer tasteThe builderOne visible line you can take out before signing
EscalationMovement after the pricing-as-of dateWhoever the contract saysA dated line, never a percentage folded in
Unforeseen conditionsWhat the drawings could not show on a remodelNegotiated when it opens upSized to age and scope, never a flat 10%
Swipe to read all four columns.
A low allowance is not a competitive price. It is a fight scheduled for month five.See it on my plan set
TRY IT ON ONE HOUSE

Send one plan set and price a single house first

Name the plan, the elevation and the lot, and a fixed price with a delivery date comes back in writing. Nothing is billed until you approve that number.

Get a fixed quote See how it starts
THE PER SQUARE FOOT QUESTION

Cost per square foot is an output, not an input

Two builders price one plan and land $40 per SF apart without either being wrong. Here is what the denominator is doing, and how to back a defensible figure out of an estimate.

How do builders calculate cost per square foot?

Backwards out of a finished estimate, never forwards into one. Total the hard cost, divide by a stated area. The figure reads only if the denominator is named, because under-air and under-roof on one house give two numbers a buyer calls a discrepancy.

Which square footage goes in the denominator?

Name it or the number means nothing. Under-air, or conditioned, area excludes the garage, covered porch and unfinished attic. Under-roof includes them at full area. Most builders publish under-air and carry porch and garage at a fraction.

Why do two builders land $40 per SF apart on one plan?

Because the figure hides foundation type and stem height, lot grade and the cut and fill behind it, roof pitch and how cut up it is, plate height, window-to-wall ratio, spec level and plan shape. A 6:12 gable and a cut-up hip roof never share a rate.

What does a residential construction cost estimator use it for?

Sanity checking, and nothing else. A residential construction cost estimator finishes the detailed line item estimate for building a house, divides by the stated area, then compares it against closed jobs of the same spec level. Landing far off reopens it.

Can you just give me a per square foot number for my market?

Not honestly, and neither can the tables online. Published averages date within months and blend spec levels differing by a factor of three. What you can have is your own figure, from your own plan and your subs' rates.

Want the figure out of your own plan instead of somebody's state average?Price my plan
FOUNDATION TO DRY-IN

Foundation, framing and shell, where the quantities come from

This is the half of the estimate that decides the other half. Foundation type, framing method and roof geometry are settled before a buyer picks anything, and most finish quantities downstream are measured against them.

Foundations on a single family home construction estimate

Frost depth, lot grade and stem height decide this line. The floor plan barely touches it.

Slab-on-grade

Warm climates

A monolithic pour with a turndown and a stem wall with a separate slab do not cost alike. The number moves on stem height off the fall across the pad, engineered fill in CY, under-slab plumbing by fixture group.

Crawlspace and pier and beam

Mixed climates

Stem height, block against poured, vented against sealed. The forgotten lines are access, insulation and the ground vapor retarder, plus a pier layout that changes with the floor framing.

Basements, walkout and daylight

Cold climates

Priced by wall height and lineal foot of foundation wall, not the finished area above. Footings go below the local frost line, so a 42 inch frost depth in the upper Midwest buys wall a Gulf Coast slab never pays for.

Custom home estimating services and the framing method

The method decides what the takeoff produces, and what the truss plant already produced.

Truss package against a stick-framed roof

Roof

With a sealed truss package the manufacturer's lumber list covers the roof, so the takeoff covers walls, floor system and sheathing and never counts roof framing twice. A stick roof comes off the roof plan and the elevations: rafter count is ridge LF divided by spacing plus one per side, then hips, valleys, ridge board, ceiling joists and collar ties added by hand.

Wall framing arithmetic

By LF and BF

Studs run at wall LF times 0.75 on 16 inch centers, then corners, T intersections, headers, king, jack and cripple studs come off the plan rather than a factor. LVL, PSL and GLB by size, TJI or dimensional joists by LF.

Material takeoff services
  • The check that catches a double count

    A conventional one-story runs roughly 6 to 8 board feet per SF of living area. Outside that band something got counted twice or missed. A framing and lumber estimate for house plans in your yard's units is a buy list.

New home construction estimating services: roof, envelope and waste

Squares, slope multipliers, and waste stated per material instead of one number on the house.

Roof and envelope quantities

Square, SF, LF

Plan area times the slope multiplier gives roof area: a 6:12 is 1.118, a 10:12 is 1.302. Then hips, valleys, ridge and rake by LF, drip edge, underlayment and ice-and-water shield by climate zone. Below that, WRB by SF, weep screed by LF, siding by square by profile, soffit and fascia by LF.

Schedules and waste

Named factors

Window and door schedule counts are reconciled against the elevations, and disagreements reach you with the dollar impact before delivery. Waste is named per material, because drywall and hip roof sheathing do not shrink alike.

ADU cost estimate services

Small footprint

An accessory dwelling unit is not a small house priced by ratio. On 600 to 1,000 SF it carries a full kitchen, a bath, its own service and utility runs, so it routinely runs above the main house per SF.

Send the architecturals, structurals and foundation plan. That is enough to quote the shell.Get my shell priced
WHAT AN OPTION DRAGS WITH IT

Option and upgrade pricing, as deltas off a base plan

A builder sells an option at a single line price and quietly eats the cascade. Every option is two numbers: what the buyer sees, and everything downstream that moves with it.

Send the base plan and the option list. Each cascade comes back priced beside the headline.Price my option matrix
BASE PLAN, THEN LOT DELTAS

A per lot estimate for a repeat plan, priced once, then by the lot

Read this if you build the same plan more than twice. The base plan is priced once and carefully. After that only the lot changes, and the lot is a short list.

1

Price the base plan once, to the stud

A full build-up on one elevation on a flat lot: foundation, shell, MEP, interior finish, cabinetry, appliances. Every later number is a delta against it, so it gets the sheet-by-sheet pass and the two-step check.
The only slow one
2

Separate what repeats from what the lot decides

Priced once: vertical structure, interior finishes, trim, cabinetry, MEP, appliances. Priced per lot: foundation type and stem height, cut and fill, driveway and culvert, utility runs and tap distances, erosion control. Elevations A, B and C differ in wainscot, pitch and porch depth, and each one is priced as its own delta against the base.
One pass
3

A spec home cost estimate against a real lot

Take the base, apply the elevation delta, then price the dirt: fall across the pad and the stem height that follows, cut and fill in CY off the plat grades, rock, clearing and stumps, SWPPP, driveway LF, septic against sewer. Your impact and tap fees ride as named soft cost lines carrying your figures, because your jurisdiction sets them and we do not. Two identical houses on two lots in one subdivision routinely part by five figures.
Per lot
4

Production builder estimating across a release

Once the base is right, production builder estimating is a spreadsheet exercise. Twenty lots come back as twenty columns off one workbook, each with its own foundation, site line and elevation, so you can see which lots carry the margin. Your plan library stays yours, and an NDA is signed on request before a sheet moves.
Price a base plan
Per release
5

Townhome and duplex estimating services

A townhome band is a repeat plan turned sideways. Interior units, end units and the party wall between them are three takeoffs, not one multiplied by six. End units carry a whole extra elevation, its glazing and its siding. Interior units carry a rated party wall on both sides and almost no exterior at all.
By unit type
6

Multifamily construction estimating services, wood-framed

The repeating unit is taken off once and multiplied by unit count, then corridors, stairs, amenity and common area are broken out separately, with per-door metrics beside the total. Wood-framed Type V and Type III multifamily, meaning garden, wrap, low and mid-rise, townhome, condo and build-to-rent, is priced on the residential desk, and concrete or steel podium, Type I and Type II and high-rise is priced on the commercial desk.
By unit mix
Building the same plan on more than three lots? The base plan is the only one you pay full freight for.Price a base plan and two lots
BEFORE YOU COMMIT ANYTHING

Ask about a plan library, or send a set for a free read

The free plan-set read costs nothing: which sheets are present, which intake items are missing, how many allowance lines the set will force, and your option count.

Ask about a plan library Call (510) 810-0346
WHAT THE BANK READS FIRST

A residential estimate for a construction loan, mapped to the draw schedule

A lender reads the draw structure before the line items, because that is what releases money. A front-loaded budget, where the first two draws carry half the contract, goes back across the desk.

Five milestone draws plus retainage: how a builder budget for a bank construction loan is laid out as a schedule of values for residential construction.
Draw 1Permits, site and foundation complete15-20%Fees, clearing, cut and fill, footings, slab or stem
Draw 2Framing and dry-in complete20-25%Lumber, trusses, hardware, sheathing, roof, windows
Draw 3MEP rough and insulation passed15-20%Plumbing, HVAC and electrical rough, insulation
Draw 4Drywall, trim, cabinets, exterior20-25%Board and tape, trim, cabinetry, siding, brick, paint
Draw 5Final trim, flooring and the CO15-20%Flooring, fixtures, appliances, punch, final grade
RetainageHeld back until completion, not a sixth draw5-10% withheldTaken from every draw, not parked on the last
Swipe to see what each draw has to prove.
We format the budget to your lender's draw structure. You submit it. We do not perform draw inspections, sign certifications or touch lien waivers.Format my budget
CODED TO YOUR BOOKS

NAHB cost codes or CSI, delivered in both columns

Builders run NAHB codes and job-cost software. Bank reviewers read CSI divisions. The file carries both, and consistent coding is what makes your own closed jobs usable.

THE BUILDER'S SIDE

The NAHB cost code estimate format

Land and site, then shell, then mechanicals, then interior finish, grouped the way a house gets built and paid for. Almost every builder has bent that standard to their own history, so your numbering is what gets used.

Your chart of accounts, not a textbook version
THE IMPORT

Buildertrend, CoConstruct or QuickBooks job cost

A CSV with your codes in the first column, so the import is a mapping you do once instead of a week of re-keying. Send one export and the file returns in that order, with CSI 01-49 alongside for a reviewer.

A CSV you import, not a locked PDF you retype
Construction estimating services
WHY IT MATTERS

Fifteen closed jobs beat any national average

If every estimate lands in a different structure your history is unreadable and you are back to per square foot. Same codes job after job and the estimate and the closeout compare line for line.

Variance readable per code, not per project
Send one export from your job-cost system and every file after this one lands in it.Match my cost codes
EXISTING CONDITIONS

Home remodel cost estimating services, and the conditions nobody can see

New construction is measured off a drawing. A remodel is measured off a drawing plus a building already lying to you. Here is what an estimator can and cannot see from photographs.

What can be priced from what you send

Plans, a field-verified as-built and honest photographs get you most of the way.

Plan-only against field-verified as-builts

As-builts

An as-built is somebody else's measurement of a standing building. From a laser survey it holds. From a tape and an afternoon, wall thicknesses, ceiling heights and out-of-square conditions move, and each moves a quantity.

  • What we do instead of ignoring it

    The estimate names the drawing it was built from and its issue date, then lists the dimensions the number is most sensitive to, so your PM verifies five on site.

Demolition quantified, not allowed for

By volume

Demo is priced by the volume coming out and the pulls it takes: CY by material type, dumpster size, number of pulls, and whether a truck reaches the back of the house. A second-floor gut with one stair carries labor a ground-floor gut never sees.

A whole house remodel estimate

Full gut

New construction quantities plus demolition, plus the cost of working inside a standing envelope: protection, dust control, staging, and trades that cannot overlap on one path in. Matching existing trim costs more than replacing it.

What nobody can price until it opens

The honest list, and how the line that covers it gets sized.

Structural modifications

Beam and posts

Removing a bearing wall is a beam, two posts, point-load footings under both, shoring while the load transfers, and the repair afterwards. We price to the structural design you provide and do not size the beam. Without an engineer's sketch the line carries an allowance, flagged unresolved.

Pre-1978 and hazardous material

RRP

A house built before 1978 pulls the lead-safe RRP rules in once the work disturbs more than six square feet of interior painted surface, or twenty outside. Popcorn ceilings, floor tile and pipe insulation from that era can carry asbestos. Both are priced only where a survey or spec section defines them.

Sizing the unforeseen-conditions line

10 to 20%

One flat percentage on every remodel is a habit, not a contingency. The line is sized to the building's age, to how much structure is being opened, and to what the photographs already show.

  • What pushes it toward 20%, and what pulls it back

    Up: pre-1960 construction, a full gut, cast iron waste still in service, knob and tube, additions of unknown vintage, plumbing under a slab. Down: a 2005 house, two baths inside an untouched envelope, photographs of what is behind one wall.

When the repair is funded by a carrier

Different ruleset

If an insurance claim is paying, the number is not built up from divisions at all. It is written to the carrier's price list for the loss ZIP and month, on a different desk. Blending the two produces a document neither the carrier nor your buyer will accept.

Xactimate insurance estimates
Send the as-built, the scope narrative and twenty photographs. The unforeseen line comes back sized, with its reason beside it.Price my remodel
WHAT THE ESTIMATE IS FOR

Cost plus or fixed price changes what the estimate has to do

The same house and the same quantities produce two different documents. What changes is who holds the risk on the day a number turns out wrong.

COST PLUS

Cost plus and a guaranteed maximum

Under cost plus the estimate is a budget the client reads and a control document you build against. A miss surfaces as a conversation in month three, not as your money. Under a guaranteed maximum it becomes a ceiling and every assumption becomes contractual.

The estimate doubles as the budget you report against
FIXED PRICE

Fixed price and lump sum

Under fixed price the estimate is your risk position for nine months. Every quantity you missed is yours, every allowance you set low is yours the moment the buyer picks, and escalation before the framing order is yours unless the contract says so.

Contingency sized to real unknowns, on its own line
Overage terms agreed in writing before signature
UNIT PRICE

Unit price work inside a residential contract

Rock excavation by CY, extra pier depth by LF, fill by the load, well depth by the foot. Where nothing can be quantified until the machine is on the lot, a rate agreed in advance turns a fight into arithmetic.

Rate and assumed quantity stated, not just the rate
THE COMPARISON

Residential vs commercial construction estimating

Residential prices to NAHB codes, an allowance schedule, a draw schedule and a buyer who keeps changing selections. Commercial prices to CSI divisions, an owner's bid form, alternates and unit prices, and a bid opening at a stated minute.

Commercial construction estimating services
Name the contract type at upload and the estimate is built for it from the first line.Name my contract type
PUBLISHED BEFORE THE SALE

Hard costs, soft costs and what we deliberately leave out

Most estimating firms publish what is included. This is the other list, printed before you spend anything, because every argument at month six starts with something unwritten.

Land, the lot premium and anything paid before closing. A hard cost estimate starts at the property line.
Impact fees, tap fees, permit and plan review, survey and soils. Named as soft cost lines carrying your figures, because your jurisdiction sets them.
Architect and engineering fees, loan interest, builder's risk, warranty reserve and realtor commission. Outside the hard number, listed so nobody assumes.
Your margin. We produce cost. What you put on top is yours, and nobody here sets it, protects it or advises you on it.
Manual J block loads, Manual D duct layouts, HERS ratings and beam sizing. We price to the design you provide and quantify insulation, duct and equipment.
Any professional engineering stamp. Nothing leaving this office is sealed, and nothing here is a permit document.
Sub quotes and supplier pricing obtained on your behalf. Nobody here calls your framer, your truss plant or your lumber yard. Baselines are RSMeans and the National Construction Estimator, and your own rates overwrite them in the file.
Draw inspections, lender certifications and lien waivers. We format the budget and hand it over. The submission is yours.
Abatement where no survey or spec section defines it. It is excluded rather than carried as a round allowance.
A guarantee of accuracy. The band is 3-5% against actuals, checked by a second estimator. A firm quoting a bid-win rate is claiming credit for your own pricing.
Scope the drawings never showed. Where the set is silent it is written as an assumption or an exclusion, and you decide which before delivery.
Work you do not need us for. One plan, flat lots, and a framer who has held their number three seasons: you already own that estimate. Send the lot delta or send nothing.
That list is why the assumptions sheet ships with every package instead of being reconstructed later.See what gets excluded on mine
BUILDING ALL YEAR

Put the whole season on a monthly partnership

Starts bunch up in spring and go quiet in February. The monthly partnership runs a priority queue with unlimited revisions and revised plan issues included, and a quiet month carries into the next one instead of paying for an idle desk.

Size my partnership Talk it through
DATES AND DOCUMENTS

Pricing as of a date, and what to send us to start

An estimate with no date on it is a rumor. Here is how the pricing-as-of date works, what a re-price costs, and the ten things that make your set quotable.

Every estimate leaves with a pricing-as-of date on the cover, because the number is only true against the market that day. Supplier quote validity has compressed in most markets from thirty days toward fourteen to twenty-one, and framing lumber can move further between your estimate and your framing order than every finish upgrade in the house combined.

A re-price is not a new estimate. The measured quantities stand and only the material-sensitive lines move to the new date, so it is quoted as a fraction of the original work rather than as a fresh package. Revisions are a different thing and included on unchanged scope: our error, a line rechecked, a reformat into your codes.

Almost no residential set arrives complete. The finish schedule is brand names with no model numbers, the plat has no grades, the energy report is still with the rater. That is normal and does not stop the estimate. What changes is how many lines carry an allowance rather than a measured quantity, and that count predicts how far the number moves.

Builders search for residential estimating services near me because they assume the estimator walks the lot. On a plan set they do not: the work is measured off your drawings and delivered by email, in all 50 states, from 7901 4th St N STE 300, St. Petersburg, FL 33702. Being local would buy you labor rates, which you already hold, and the rate column is yours.

How long it takes, and what decides where you land
Delivery runs 24-96 hours from an approved fixed quote, and no turnaround is promised on the quote itself. Where a house lands inside that window is decided by plan size, trade count, and how many elevations and options ride as deltas. A date goes in writing before work starts.
The full plan sheet list, including structurals and the foundation plan
The finish and specification schedule, at whatever detail exists
The plat or survey with grades, plus the finished floor elevation
The soils report, where one was pulled for the lot
The energy report, for insulation, glazing and equipment
The elevation package, and which elevation this lot gets
Your option list, marked with what this buyer has taken
Your NAHB code list, or an export from your job-cost system
The contract type, and the draw structure if a lender is in it
Anything you hold: a framer's number, a truss quote, a concrete price
Missing half of that? Send what exists and the free plan-set read names the gaps that cost money.Send what I have
THREE MODELS, ONE FILE

Home builder estimating services, per bid, monthly or dedicated

Three ways to run an outsourced estimator for home builders, and one honest case for none of them. Residential volume is never flat, and a salaried seat costs the same in February whether you started a house or not.

All three run the same two checks and the same file. What changes is who holds your plan library and what a slow month costs.
Best forOne custom home, or a first job with usTwo or more houses started a monthA plan library and a release calendar
Against in house~25-35% less~40-55% less~35-45% less than a loaded seat
CommitmentNone, one house at a timeFlat monthly retainerOne estimator assigned to your work
Delivery24-96h from an approved quote24-96h priority queue8 hours a day, 5 days a week
RevisionsIncluded on unchanged scopeUnlimited, revised plan issues includedIncluded on unchanged scope
Quality checkTwo-step QATwo-step QATwo-step QA, same estimator each time
Your cost codesOn requestStandingStanding
A slow FebruaryYou spend nothing at allQueue carries into the next monthThe estimator works your backlog
Do not buy it whenYou already priced this exact planYou start fewer than four houses a yearYour work will not fill a 40 hour week
Hover or tab a column heading to widen that column.
Tell us how many starts you have booked this year. If none of the three beats keeping it on your own desk, that is the answer that comes back.Work out my model
FAQ

What builders ask before they send the plans

The questions that come in the week a builder decides whether to hand the plan set over.

What you get

What should a residential construction estimate include?

Quantities measured off your plans, a unit cost and an extension on every line, labor and material split, an allowance schedule with a basis behind each dollar, and a written assumptions and exclusions sheet, coded to your accounting.

What is a construction allowance in a home build?

A placeholder amount for an unselected item, carried with a unit basis and quantity: 2,000 SF of flooring at $4.50 per SF installed. The gap between that and the buyer's pick is the allowance overage, billed at cost plus your markup.

Can I get the quantities without any pricing?

Yes, and it costs less. Counts, lengths, areas and volumes arrive with the marked-up sheets and no prices. Builders who buy their jobs out order it that way, because what they lack is leverage on the framer.

Accuracy and timing

How accurate are residential construction estimates?

Ours land within a 3-5% variance band against actuals, from measuring quantities off the plans rather than applying a per square foot rate, and from a second estimator auditing before it ships. Nothing in estimating is exact.

How long does a residential estimate take?

24 to 96 hours from an approved fixed quote. Where your house lands in that window depends on plan size, trade count, and how many elevations and options are carried as deltas. No turnaround is promised on the quote.

Who checks the estimate before it reaches me?

Two people, and only two. The estimator who built it rechecks quantities against the plans and unit costs against the baseline. A second estimator audits independently, allowance basis and waste factors included, before anything reaches you.

I checked every line last time I outsourced. Why is this different?

Because the assumptions sheet and the marked-up plans arrive with the workbook. Pick any line, find the wall it was measured off, read what was assumed. More than a few seconds to trace it and the package failed you.

Money

How much do estimating services cost for home builders?

It is quoted per plan set, not per square foot or per hour, in writing before anything is billed. Against carrying the work in house, a per house engagement typically saves 25 to 35 percent, a monthly partnership 40 to 55 percent.

What does it cost to re-price an estimate that has gone stale?

A fraction of the original, quoted in writing like anything else. Send the same set back with the date you want it priced to, and the material-sensitive lines refresh while the measured quantities stand. That is different from a revision, which is included whenever the scope has not moved.

Do I pay anything if I decide not to proceed?

No. An estimator reads the plan set, then one fixed price and one delivery date come back in writing, and nothing starts until you approve them. If either does not suit you, the quote lapses at no cost.

Fit

Does a cost plus or fixed price home building contract change the estimate?

Yes, in what it has to withstand. Under cost plus it is a budget and a control document. Under fixed price it is your risk position for nine months, so the contingency line and overage terms must be right before you sign.

Do you cover multifamily?

Wood-framed only, and the line is drawn on structure rather than on unit count. Garden, wrap, low and mid-rise, townhome, condo and build-to-rent all sit here, priced with per-door metrics beside the total. The moment the podium goes to concrete or steel, the job changes desks and the section above says exactly where.

I collect sub bids and do not estimate. Is this still worth anything?

Yes, and it is why quantities only is the most ordered residential package. Three bids that disagree by twenty percent do not tell you which one is wrong, and a measured count does. It also prices the scope none of the three carried, which is the part that reaches you at buyout.

Price your next house
before you price the lot

Upload the plan set, name the elevation, and say whether a buyer, a bank or a lot decision reads the number. A fixed price and a delivery date come back in writing.

Get a fixed quote
STEP 1 OF 2
What do you need?
Project type
When is your bid due?
Describe your scope
Under a minute · No account, no payment
Rather talk it through? Call +1 (510) 810-0346 or book a 15-minute scope call. Not ready? See a real anonymized package first.