Plumbing Takeoff: Count Fixtures, Pipe, Fittings and Hangers by System
One restroom block taken off start to finish: fixtures by system, pipe by size and material, fittings and hangers by written rules, and the questions that sit between sheets.
Worked takeoff guides for single trades: electrical devices, conduit and wire, framing lumber, and plumbing fixtures, pipe, fittings and hangers. Each guide takes one illustrative scope from the drawings to counted and measured quantities, prints every input, shows the arithmetic line by line, labels each assumption and names the items that fall between sheets. They are written for subcontractors, builders and in-house estimators who price from plan sets. The method is meant to be checked against your own numbers, whether you measure by hand, on screen or hand a trade to an outside desk. Each guide also says what belongs in the exclusions and what to do when the set is larger than the week allows.
What ships with every package

One restroom block taken off start to finish: fixtures by system, pipe by size and material, fittings and hangers by written rules, and the questions that sit between sheets.

One invented office floor, taken off start to finish: a device tally by room, conduit measured along the route with its drops, wire derived from conduit, and the items no sheet shows.

A worked lumber takeoff for a small framed house, with every stud, plate, header, joist and sheet count shown, rounded to stock lengths and ready to send to suppliers.
Send the plans and get a fixed quote
24-96h from an approved quote, two-step QA, NDA signed on request.