Bid Estimate vs Quote vs Proposal: What Each Document Is For
Four documents carry a construction price, and each does a different job. See who writes and reads each one, where each fails, and one job priced through all four.
Cost estimating guides that show how a pre-bid number is built and how to defend it. Follow the steps from scope and quantities to labor, material, equipment and subcontract prices, then to general conditions, overhead, profit, allowances and contingency. Learn how an estimate sheet grows out of takeoff quantities, why markup and margin are different arithmetic, and how an estimate, a quote and a proposal differ. The guides use units, hours, index numbers and percentages instead of local prices, so the method holds in any market and any year. They also say how close an estimate can land at each stage of design. Written for owner-estimators, small general contractors and project managers who must explain a number to an owner, a lender or a partner.
Every package includes

Four documents carry a construction price, and each does a different job. See who writes and reads each one, where each fails, and one job priced through all four.

Copy the columns, a two-line worked example, a markup-to-margin table and a quote view into a blank workbook. Every price line starts from a quantity.

A pre-bid number is a stack of measured quantities, unit costs with named sources, general conditions, risk, overhead and profit. Seven steps with the arithmetic shown.